Site work for a water / sewer project in North Miami Beach, Florida. Completed plans call for site work for a water / sewer project.

The project is comprised of the installation of a 60-inch Prestressed Concrete Cylinder Pipe (PCCP) Force Main in the City of North Miami Beach that connects to an existing 72-inch Water and Sewer Department's force main. The project is located between the intersections of NE 151 Street and Biscayne Boulevard and NE 163 Street and NE 8 Avenue, in Sections 16, 17 & 18, Township 54S, Range 42E, in the City of North Miami Beach, Miami-Dade, Florida. The 60-inch force main alignments that will cross Biscayne Boulevard, the FEC Railway, and West Dixie Highway will be installed using microtunneling methods. The remaining portions of the proposed 60-inch force main have been designed using open-cut method of construction. The scope of work includes, but is not limited to, the furnishing and installation of approximately 12,500 linear feet of 60-inch PCCP, including the corresponding fittings and valves; microtunnel installation at NE 151st Street and Biscayne Boulevard including two (2) 30-feet deep shafts, and approximately 600 linear feet of 84-inch steel casing and 60-inch PCCP; approximately 200 linear feet of 84-inch steel casing and 60-inch PCCP at FEC Right-of-Way; furnishing and installing one (1) 72-inch by 60-inch tapping saddle and one (1) 60-inch tapping valve required to make a tapping connection to an existing 72-inch force main at NE 151 Street east of Biscayne Boulevard; furnishing and installing six (6) Air Release Valves and fifteen (15) Automatic Air Release Valves; furnishing and installing six (6) 60-inch Flanged Plug valves; relocation of approximately 1,400 linear feet of 12-inch ductile iron water main including one(1) fire hydrant assembly; furnishing and installing approximately 270 linear feet of 16-inch force main; furnishing and installation of 28 access manholes; furnishing and installation of approximately 50 feet of 18-inch HDPE storm drainage pipe, approximately 50 feet of exfiltration trench and 2 storm inlets. The construction estimate (consisting of biddable items) for this project is $23,960,532.34. NOTE: THIS AMOUNT DOES NOT INCLUDE A CONTINGENCY ALLOWANCE, OR DEDICATED ALLOWANCES. The construction time from Notice to Proceed is 425 consecutive calendar days to Final Completion. Bidders shall also send a hardcopy of their Bid to the Miami-Dade Water and Sewer Department is 3071 SW 38 Avenue, Miami, FL 33146, to the attention of the Construction Contracts Section, which must be post marked within 24-hours of the bid submittal deadline. The County reserves the right to postpone or cancel the bid opening at any time prior to the scheduled opening of bids. The Bid Proposal must be accompanied by a bid security in an amount not less than five percent (5%) of the total bid. The bid security can be in the attached Prescribed Bid Bond form, which shall be executed by the Bidder and a qualified Surety, satisfactory and payable to the Miami-Dade County, Florida, Board of County Commissioners. The bid security can also be in the form of a certified check or cashier's check on a solvent national or state bank. The successful contractor must execute a one hundred (100%) Surety Performance and Payment Bonds. NO BIDDER MAY WITHDRAW HIS BID WITHIN 120 DAYS FROM BID OPENING DATE. For additional information please call Mr. Isaac Smith at (786) 552-8989 or send electronic mail to: Isaac.Smith@miamidade.gov Payments for Contract Documents must be sent through the mail, directed to the attention of Mr. Isaac Smith, Construction Contracts Section, addressed to 3071 SW 38 Avenue, Room 107, Miami, Florida 33146. Once proof of payment mailing is received, the bidder will be provided a link to download the files. Requests for information (RFI) will only be accepted up to 5:00 pm on May 21, 2020. Any rfi received after this date will not be considered. The Board of County Commissioners, Miami-Dade County, Florida, reserves the right to reject any or all bids, to waive any informality in any bid or to re-advertise for bids. Bids from any person, firm or Corporation in default on other contracts or agreements with the County may be rejected. Failure by the Bidder to satisfy claims on previous contracts with the County may be cause for rejection of his bid.Construction goal is 6.83% and the Small Business Enterprise - Goods goal is 1.98% which is based on the construction estimateplus the 10% Contingency Allowance. A \\ \ \10% Community Workforce Program (CWP) goal is applicable to this project.

Award

Water / Sewer

$28,527,996.00

Public - County

Site Work

106

1

125

7

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
45
Bidding Soon
1,090
All Active Projects
483
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2020

August 3, 2020

img_map_placeholder

Multiple Locations, North Miami Beach, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.