BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in San Diego, California. Conceptual plans call for the construction of a transportation facility.

https://la.urbanize.city/post/weekly-headlines-april-22-2023 APRIL 22, 2023, 8:15AM After emergency work to stabilize a crumbling coastal bluff in Orange County, full service resumed on April 17 for both Metrolink and Amtrak's Pacific Surfliner lines through San Clemente. "This emergency work has posed an unprecedented challenge, especially with the heavy rainfall this season, and we're very pleased to announce that passenger service can safely resume on this key stretch of Southern California rail," said OCTA chairman and Yorba Linda mayor Gene Hernandez in a statement. "We greatly appreciate the public's patience and their understanding that ensuring passenger safety is always the first priority." The LOSSAN Rail Corridor Agency, which manages the right-of-way, has been operating weekend service after completing an initial round of work to stabilize the tracks in February. However, a permanent fix for the endangered coastal tracks will take longer. Transportation officials are looking to relocate both services into a new rail tunnel which could cost $4 billion. Media giant Conde Nast is relocating its Los Angeles office to a new spot at Row DTLA, JLL announced this week. Per JLL, ROW DTLA has secured more than 300,000 square feet of office leases since January 2022. The 32-acre complex has more than 1.4 million square feet of space. JLL's Jaclyn Ward, Cassie Trosclair and Sarah Hancock oversee office leasing at ROW DTLA, while Brian Niehaus and Lalo Diaz of JLL represented Conde Nast. ___________________________________________________________________________________________________________________ The Los Angeles - San Diego - San Luis Obispo Rail Corridor Agency, also known as LOSSAN, is poised to receive $38.7 million in funding to construct new maintenance facilities in San Diego and San Luis Obispo. These new facilities will allow for longer trains at more frequent intervals, thus improving service on Amtrak's Pacific Surfliner. The approximately $87-million project is on pace for completion in 2026. As of April 13, 2021, a site selection study was completed in December 2020. A request for proposals is to be released by the owner for preliminary engineering and environmental clearance. The environmental clearance and preliminary engineering phase is anticipated to begin in the summer or fall of 2021 and is anticipated to be completed in early 2023. Final design is anticipated to be completed by early 2024 and construction is anticipated to begin in early to mid-2025. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Transportation Terminals

$87,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
120
Bidding Soon
1,468
All Active Projects
705
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 3, 2025

December 31, 2026

img_map_placeholder

Multiple Locations, San Diego, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.