Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 3, 2025 at 8:00 PM
Updated May 4, 2025
Renovation of a water / sewer project in Wichita Falls, Texas. Conceptual plans call for the renovation of a water / sewer project.
Update: The Cypress 1961 Plant is currently inoperable and needs to be rehabbed to bring online. Rehab would include new slide gates for raw water feed, new flocculators, resurfacing the basin floors and walls, repairing and repainting the scrapers, replacing the settled water launders, replacing the filter surface wash, replacing filter influent and effluent valving, replacing filter controls and adding SCADA feedback, repairing/replacing finished water piping. Project is included in City of Wichita Falls Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Plans call for rehab or replacement. This rehabilitation project would affect all of the major components of the treatment train; flocculators, baffles, wiers, filter media, filter controls and filter backwash components. This rehab is also necessary to assure that this plant can meet all of the drinking water requirements. The project is included in the City of Wichita Falls 2023-2027 Capital Improvement Program (CIP). As of June 1, 2023, information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$15,000,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2028
To Be Determined, Wichita Falls, TX
Related To This Project
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
Bid Date: Jun 20 2023
Wichita Falls, TX
Bid Date: Aug 10 2023
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
Bid Date: Aug 03 2023
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
--
Wichita Falls, TX
Bid Date: Dec 10 2021
Wichita Falls, TX
Bid Date: May 16 2023
Wichita Falls, TX
Bid Date: May 23 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
