Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a transportation facility in Anniston, Alabama. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
As of 6/26/2020 project was not yet been awarded. Antoicipated award date is after 2 weeks. The project includes, but is not limited to, pavement milling and crack repair, construction of single bituminous surface treatment, asphalt leveling, asphalt surfacing, pavement marking, and shouldering grading as shown on the plans and indicated in the specifications. For questions about the project, contact Jennifer Harp at JHHarp@GarverUSA.com. The successful Bidder must furnish Performance and Payment Bonds in accordance with the General Provisions. All Bidders shall make good faith efforts, as defined by Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract a minimum of 9.16% of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals DBE). Bidders must be licensed to perform work within the state of Alabama. Federal Requirements for Federally Funded Projects. This Project is being partially funded under the Federal Aviation Administration (FAA) Airport Improvement Program (AIP). Contractors must comply with specific federally required provisions as listed herein and contained in the contract documents. The following federal provisions are incorporated in this solicitation by reference: " Buy American Preference (49 USC 50101) " Trade Restriction Certification (49 USC 50104, 49 CFR part 30) " Disadvantaged Business Enterprise (49 CFR part 26) " Davis-Bacon Requirements (2 CFR 200, Appendix II(D), 29 CFR Part 5) " Procurement of Recovered Materials (2 CFR 200.322, 40 CFR part 247, Solid Waste Disposal Act) " Debarment and Suspension (2 CFR part 180 (Subpart C), 2 CFR part 1200, DOT Order 4200.5) " Lobbying and Influencing Federal Employees (31 USC 1352, 2 CFR part 200 Appendix II(J), 49 CFR part 20 Appendix A) Affirmative Action Requirement. 1. The Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Timetables Goals for minority participation for each trade: 14.3% Goals for female participation in each trade: 6.9% These goals are applicable to all of the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction. The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. 4. As used in this notice and in the contract resulting from this solicitation, the "covered area" is City of Anniston, Talladega and Calhoun Counties, Alabama. Civil Rights Title VI Assurance The CITY OF ANNISTON, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC 2000d to 2000d-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that any Contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Bids must remain in effect for 90 days after the bid opening date. Within 90 days from the bid date, the Owner may award the contract to the lowest responsive, responsible Bidder or reject any or all Bids for the Project. City of Anniston reserves the right to reject any or all bids, to waive irregularities in the bids and bidding deemed to be in the best interests of City of Anniston, and to reject nonconforming, nonresponsive, or conditional bids.
Bid Results
Transportation Terminals
$3,415,567.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 26, 2020
July 27, 2020
1 Cliff Garrett Dr, Anniston, AL
Related To This Project
Anniston, AL
Bid Date: Jan 08 2019
Anniston, AL
Bid Date: Feb 01 2022
Anniston, AL
Bid Date: Jan 27 2022
Anniston, AL
Bid Date: Jul 20 2021
Anniston, AL
Bid Date: Jan 23 2023
Anniston, AL
Bid Date: Sep 27 2022
Anniston, AL
Bid Date: Sep 19 2022
Anniston, AL
Bid Date: Aug 18 2022
Anniston, AL
Bid Date: Aug 22 2022
Anniston, AL
Bid Date: Aug 08 2022
Anniston, AL
Bid Date: Aug 09 2022
Anniston, AL
Bid Date: Jul 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.