BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a golf course in Fernandina Beach, Florida. Completed plans call for the renovation of a golf course.

**As of June 17, 2020, the project has not yet been awarded. A timeline for award has not yet been established.** Several improvements to the Fernandina Beach Golf Course are anticipated: the driving range, North Course greens (Holes No. 3 and No. 5), and the practice putting green area. Driving Range • Strip and dispose of (on-site) existing sod • Remove existing bulkhead at tee area and shape entire surface to one level • Sod with Certified 419 turf, total area estimated 25,000 sq. ft. • Laser grade with .5% fall, total area estimated 18,000 sq. ft. • Install new irrigation heads (ten) North Course Greens • Strip and dispose of (on-site) existing sod • Reshape green at Hole No. 3 (in accordance with prepared design) • Expand and shape green at Hole No. 5 (in accordance with prepared design) • Sod collars and disturbed areas with certified 419 turf • Install additional irrigation loop at Hole No. 5 • Reshape bunker at Hole No. 5 (in accordance with prepared design) • Final float surfaces Practice Putting Green Area • Preparation of putting green and surrounding area (removal of turf and existing irrigation, as needed) • Core 8” depth remove organics of new putting green area (dispose of on-site) • Shape sub-grade of area, including practice sand bunker, (in accordance with prepared design) • Install new irrigation loop (ten heads) • Provide and install 4” of USGA-grade sand to be mixed into native soil from on-site as rootzone material of the new putting green • Provide and install 6” of bunker sand • Till, compact, and final float entire area of putting green (estimated 7,000 sq. ft.) • Provide and install Certified 419 (estimated 5,500 sq. ft.) • Estimated 100 linear feet of new curb to redirect water from path around the practice putting green • Plant 40 Bushels per 1000 sq. ft. of ultra-dwarf sprigs, variety to be determined Owner

Award

Golf Course

$129,435.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
32
Bidding Soon
608
All Active Projects
259
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2020

June 29, 2020

img_map_placeholder

2800 Bill Melton Rd, Fernandina Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.