BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 12, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, renovation and addition to a mixed-use development in Fort Collins, Colorado. Working plans call for the addition of a detention facility; for the demolition of a detention facility; for the renovation of a detention facility; for site work for a detention facility; municipal facility; municipal facility; municipal facility; and municipal facility.

The scope of this project includes, but is not limited to, the following: demolition, site work, renovation and addition to a municipal development An awarded Construction Manager has been announced. The previous solicitation is included below for reference: All questions regarding this proposal must be emailed to Les Brown, Purchasing Agent, at brownxld@larimer.org. Questions are due no later than 10:00 a.m. (our clock) January 20, 2021. No questions will be accepted after the date and time referenced above. All questions received will be answered via Addendum only. Addenda will be published at both Rocky Mountain e-Purchasing. Larimer County intends to enter into a contract with one (1) qualified General Contractor through this Construction Manager at Risk (CMaR) solicitation to provide pre-construction and construction services for an expansion to the existing Alternative Sentencing Department building. The expansion project will occur at the existing Larimer County facility at 2307 Midpoint Drive in Fort Collins, CO. It is anticipated that the CMaR contractor will be selected by the end of February 2021. The existing Alternative Sentencing Department (ASD) building was constructed in 2011/12 and provides alternative sentencing options for lower-level crimes. The sentence allows the offender to continue working while still serving their sentence. The offender also pays for a portion of the cost of the program. This allows Larimer County to carry out offender sentences at a much lower rate than in the Jail. The expansion at the Alternative Sentencing building will include approximately 170 new beds along with the staff space to support the expanded programs. The current women in Alternative Sentencing as well as the women's programs in Community Corrections will move in and occupy the new beds, leaving behind existing beds to be used by the men's programs in Alternative Sentencing and Community Corrections.

Pre-Construction/Negotiated

Municipal

$5,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
71
Bidding Soon
1,316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2021

August 15, 2022

Project location map

2307 Midpoint Dr, Fort Collins, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.