BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2021 at 7:00 PM

Updated May 15, 2025

Renovation of a laboratory facility in Devon, Alberta. Completed plans call for the renovation of a laboratory facility.

The project is to replace Motor Control Centres (MCCs) for the Grey Analytical, High Head & Pilot Plant Builings at the Devon Research Centre (DRC) facility. The scope of work will include replacing the identified MCCs, including all identified integral components. Scope will include demolition, and electrical construction. The project will have a strictly enforced timelines in which equipment can be shutdown, due to this being an active site with ongoing processes that cannot be simply shutdown, and all shutdowns will need to be coordinated with site stakeholders after project award. Expect shutdowns to take place after normal work hours.

Award

Laboratories

$987,000.00

Public - State/Provincial

Renovation

16

5

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
14
Bidding Soon
631
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2020

August 1, 2020

Project location map

1 Oil Patch Dr, Devon, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.