BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in White City, Oregon. Completed plans call for site work for a water / sewer project.

*Contract Award Date: Sep 24, 2020 Contract Award Number: 36E77620C0077 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 117535800 Contractor Awarded Unique Entity ID (SAM): Contractor Awarded Name: AFCI-CCI JV ONE LLC Contractor Awarded Address: ELK GROVE VILLAGE, IL 60007 Base and All Options Value (Total Contract Value): $13493000.00000000 Magnitude of Construction: $10,000,000.00 - $20,000,000.00 Lump sum proposal for all work in all phases identified by the construction drawings and specifications. Work includes but is not limited to: Demolition; Earthwork and excavation; Exterior improvements and planting; Pipeline and utility structure removal, installation, repair and relocation; Permitting and reporting; Testing; Traffic control and VA coordination. The work shall commence in the phases indicated. The retention pond work can occur ahead of, during, or after Phase 1 but the retention pond (the stormwater quality facilities) shall be started before Phase 2 starts and shall be completed prior to the completion of Phase 2. The period of performance for the Base Bid is 620 calendar days after date of receipt of Notice to Proceed. Questions of a Technical Nature Must Be Provided in Writing and Shall Be Submitted by the Prospective Offerors to Jason Schultz. Questions Shall Be Submitted Only via E-mail to: Jason.schultz@va.gov. The Subject Line Must Read: Retrofit Campus Wide Infrastructure Systems Technical Questions. Oral Questions of a Technical Nature Are Not Acceptable. the Cut-off Date and Time for Receipt of Questions is August 20, 2020 at 2:00 Pm (Et). Any Questions Submitted After the Cutoff Date May Not Be Answered. The period of performance for the Base Bid is 620 calendar days minority participation - 2.4 % female participation- 6.9 %

Award

Water / Sewer

$13,493,000.00

Public - Federal

Site Work

73

1

32

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
2
Bidding Soon
78
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2020

November 2, 2020

img_map_placeholder

8495 Crater Lake Hwy, White City, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.