EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 19, 2020 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in Green Bay, Wisconsin. Conceptual plans call for the renovation of a educational facility.

As of June 19 the project will not be awarded due to over budget and rebid is not consider at this time. The scope of work includes the replacement of (11) total fume hoods in Science Labs SC373, SC376 and SC384, as well as a new make-up air unit in a paint booth in Trades Proto type and Design Lab. Work includes architectural building elements, electrical, plumbing, and HVAC. Work on this project will consist of a single lump sum con-tract for all work. Work on this project will consist of a single lump sum contract for all work. NWTC supports the promotion and development of Disadvantaged Business Enterprise (DBE) firms and encourages such firms to participate in the invitation to bid on this and other college projects. Bid Security is required. The accepted Bidder(s) will be required to provide a Performance, Labor and Material Payment Bond, and a Certificate of Insurance listing NWTC as additional insured". Bids must be guaranteed for a minimum B20-0147period of sixty days from the date of bid opening. Only sealed bids will be accepted when received as specified in the Project Manual. The Owner reserves the right to reject any or all bids. Contract award is contingent upon funds availability, budget considerations and any Federal or State Public Health Orders.

Project Abandoned

Educational

$241,679.00

Public - State/Provincial

Renovation

19

11

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Starting and Adjusting, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Fire Suppression Systems Insulation
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
17
Bidding Soon
359
All Active Projects
104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2020

June 20, 2020

img_map_placeholder

2740 W Mason St, Green Bay, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.