BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2022 at 7:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Chino, California. Completed plans call for site work for a water / sewer project.

Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 01/04/2022 3:00 PM (PST) Contractor shall provide all supervision, labor, tools, parts, material, equipment and other items necessary to perform all aspects of the YORBA AVENUE AND EUCALYPTUS AVENUE SEWER MAIN REPLACEMENT PROJECT (PROJECT NO. SW-211) in accordance with the attached bid documents. Work may include but not be limited to: Replacement of existing 10 and 15 Vitrified clay pipe (VCP) sewer mains with larger diameter VCP or High Density Poly Ethylene (HDPE) pipe by using a combination of trenchless and open trench methods, installation of steel casing across railroad property, install temporary bypass, replacement of existing sewer manholes, construction of proposed (new) sewer manholes, rehabilitation of existing sewer manhole, removal of existing sewer manholes, reconnection of sewer laterals, pipe backfill and bedding with asphalt concrete overlay for trench repair, adjustment of existing utility lines, full depth asphalt concrete pavement repairs, slurry seal including crack sealant and weed abatement, restoration of traffic detector loops, striping, traffic control, perform night work, and post-construction closed-circuit television (CCTV) inspection. The Project or Scope of Work is anticipated to begin in February 2022. The Project or Scope of Work must be completed within one-hundred & fifty (150) working days after the commencement date stated in the Notice to Proceed. The Warranty Bond (maintenance bond) shall be for not less ten percent (10%) of the Contract Price or $2,000.00 Folder: 03252-99 MANDATORY PRE-BID MEETING: No Mandatory Pre-Bid Meeting will be held. Each bidder shall perform due diligence to examine site and to submit request for information during bidding period in timely manner.

Award

Water / Sewer

$4,468,330.00

Public - City

Site Work

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
526
Active Projects
225
Bidding Soon
3,683
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2022

February 3, 2022

Project location map

Multiple Locations, Chino, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.