EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 15, 2020 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Whittier, California. Completed plans call for the renovation of a educational facility; and office development.

As of September 15,2020 the project is not yet awarded. A timeline for award has not yet been established. Estimated cost range is $450,000 - $500,000. District Office Modernization. Each bidder and its designated subcontractor(s) shall be a licensed contractor pursuant to the California Business and Professions Code, and be licensed to perform the work called for in the contract documents. The successful bidder must possess a valid and active Class "B" License at time of award of contract. The Contractor's California State License number shall be clearly stated on the bidder's proposal. The Contractor and all subcontractor (of any tier) must be currently registered and qualified to perform public work in accordance with Labor Code section 1725.5. Unless specifically exempted by the Labor Commissioner for this Project, the Contractor and all subcontractors shall furnish certified payroll records as required pursuant Labor Code section 1776 directly to the Labor Commissioner in accordance with Labor Code section 1771.4 on at least on a monthly basis (or more frequently if required by the District or the Labor Commissioner) and in a format prescribed by the Labor Commissioner. Unless specifically exempted by the Labor Commissioner for this Project, monitoring and enforcement of the prevailing wage laws and related requirements will be performed by the Labor Commissioner/ Department of Labor Standards Enforcement (DLSE). Each bid must strictly conform with and be responsive to the Contract Documents as defined in the General Conditions. Each bidder shall submit with his bid, on the form furnished with the contract documents, a list of the designated subcontractors on this project as required by the Subletting and Subcontracting Fair Practices Act, California Public Contract Code Sections 4100 et seq. In accordance with California Public Contract Code Section 22300, the District will permit the substitution of securities for any moneys withheld by the District to ensure performance under the contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the District, or with a state or federally chartered bank as the escrow agent, who shall then pay such moneys to the Contractor. Upon satisfactory completion of the contract, the securities shall be returned to the Contractor. Each bidder's bid must be accompanied by one of the following forms of bidder's security in an amount not less than ten percent (10%) of the total bid price: (1) cash; (2) a cashier's check made payable to the District; (3) a certified check made payable to the District; or (4) a bidder's bond executed by a California admitted surety as defined in Code of Civil Procedure Section 995.120, made payable to the District in the form set forth in the contract documents. Pursuant to California Labor Code Sections 1720 et seq., it shall be mandatory upon the Contractor to whom the contract is awarded, and upon any subcontractor under such Contractor, to pay not less than the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the contract, including holiday and overtime work as well as employer payments for health and welfare, pension, vacation, and similar purposes. No bidder may withdraw any bid for a period of ninety (90) calendar days after the date set for the opening of bids. Separate payment and performance bonds, each in an amount equal to 100% of the total contract amount, are required, and shall be provided to the District prior to execution of the contract and shall be in the form set forth in the contract documents. All bonds (bid, performance and payment) must be issued by a California admitted surety as defined in California Code of Civil Procedure section 995.120. Any additive or deductive alternates to the base bid used to determine the lowest bid will be considered using the method specified in the Notice Inviting Bids set forth in the Contract Documents and in accordance with Public Contract Code section 20103.8. Each bidder must strive to meet goals and requirements relating to participation by Disabled Veteran Business Enterprises ("D.B.V.E."), of three percent (3%) participation, established by the District, or make a good faith effort in respect thereto and provide the District with a report as to the actual participation at the conclusion of the Project. Any request for substitutions pursuant to Public Contracts Code Section 3400 must be made on the form set forth in the contract documents and included with the bid. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. *This project timeline has been extended due to the public health crisis. *This project timeline has been extended due to the public health crisis. This project was originally scheduled to bid on 06/17/2020. Bid postponed to 07/01/2020

Bid Results

Office

$468,000.00

Public - City

Renovation

19

20

65

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Alternates, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Periodic Work Observation, Submittal Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Maintenance of Unit Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Joists, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Finish Carpentry, Architectural Woodwork, Wood Paneling
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath, Metal Lath, Portland Cement Plastering, Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, High-Performance Coatings, Graffiti-Resistant Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment, Play Field Equipment and Structures, Healthcare Equipment, Therapy Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Unit Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Lifting Devices, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
141
Bidding Soon
2,183
All Active Projects
1,128
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2020

August 21, 2020

img_map_placeholder

8324 Westman Ave, Whittier, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

District Office Modernization, Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.