BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Kalona, Iowa. Completed plans call for site work for a water / sewer project.

The project consists of three Divisions of work. Contractors may bid on one, two, or three Divisions. A separate contract will be awarded for each Division. Bids which tie the Divisions together (contingent on receiving two or three divisions of work) shall not be allowed. The project consists of the following items and approximate quantities: Division 5 - site preparation; 32,620 C.Y. of earthfill; 70 - tile intakes; 24,459 L.F. of tile; 2,450 L.F. of grassed waterway; fertilizing, seeding, and mulching; and miscellaneous appurtenant work usually associated with a watershed improvement project. Division 6 - site preparation; 49,461 C.Y. of earthfill; 61 - tile intakes; 20,322 L.F. of tile; 3,500 L.F. of farm field fence, woven wire; 95 L.F. of 8-inch smooth steel pipe; 119 L.F. of 12-inch smooth steel pipe; 1,930 L.F. of grassed waterway; fertilizing, seeding, and mulching; and miscellaneous appurtenant work usually associated with a watershed improvement project. Division 7 - site preparation; 30,725 C.Y. of earthfill; 17 - tile intakes; 6,658 L.F. of tile; 76 L.F. of 8-inch smooth steel pipe; 224 L.F. of 6-inch smooth steel pipe; 430 L.F. of grassed waterway; fertilizing, seeding, and mulching; and miscellaneous appurtenant work usually associated with a watershed improvement project. The work under the proposed Contract shall commence upon issuance of the written Notice to Proceed. The proposed watershed improvements listed shall be fully completed on or before September 30, 2021. The Bidder agrees to pay as liquidated damages the sum of $1000 for each consecutive calendar day after the specified completion date that the project is not fully completed. Each bidder shall accompany its bid with bid security as defined in Section 26.8 of the Code of Iowa. Bid security shall be 5% of the bid amount. Contract Documents. Drawings and specifications governing the construction of the proposed improvements have been prepared by French-Reneker-Associates, Inc., Engineers and Surveyors, Fairfield, Iowa. The contract documents may be examined at the office of the City Clerk Division 5 - Low Bidder Leffler Dirtworks LLC $268,442 Division 6 - Low Bidder Seaton Construction, Inc. $357,168 Division 7 - Low Bidder Stek Earthmoving $197,128

Award

Water / Sewer

$822,738.00

Public - City

Site Work

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
43
Bidding Soon
432
All Active Projects
217
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2020

August 10, 2020

img_map_placeholder

Multiple Locations, Kalona, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.