Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 21, 2020 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Spokane, Washington. Contact the soliciting agency for additional information.
The work to be performed by the Consultant will vary by project and by discipline and may include design and/or construction phase assistance. Sample tasks/project components include: Geotechnical Engineering Classification of soils by appropriate methods Determination of soil properties by appropriate means Determination of foundation and wall design parameters Pavement subgrade characterization and pavement design Evaluation of water mounding in relationship to stormwater injections Conducting geophysical studies, test borings, test excavations, infiltration testing, aquifer testing Identification of restrictive infiltration layers below the ground surface Slope stability and groundwater seepage analysis Geotechnical report preparations Phase 1 and Phase 2 environmental site assessments Conducting special inspections or other geotechnical related construction phase inspections Landscape Architecture Street projects, including landscaping of pedestrian buffer strips, storm drainage areas, Gateway entry statements to communities and institutions, Pump station and other public utility buildings, Parking lots, Miscellaneous items, such as project scope descriptions, concept designs, "green" infrastructure concepts, site layouts, cost estimates, coordination efforts. Structural Engineering Steel design and analysis of existing structures Reinforced concrete design and analysis (ex. tanks, retaining walls, MSE walls, foundations and structural members such as beams and columns) CMU buildings Timber design and analysis including temporary staging, shoring and forming Miscellaneous signal pole bases, anchors, mast arms, sheet piling and caissons Surveying Boundary surveying Topographical and site surveying Mapping Platting and replatting of existing subdivisions Construction staking Writing of parcel legals Monument preservation and DNR permit processing Cultural Resources Preparation of cultural and historic resources studies including field exploration as required Coordination with area Indian tribes and DAHP Consultation with City of Spokane design engineers to recommend ways to eliminate project effects on cultural/historic resources. Construction phase monitoring where required Real Estate Appraisals & review appraisals Negotiate with property owners Prepare offer letters and administrative offer summaries Obtain property owner signatures Prepare ROW certification packages Potentially Included Projects 12th Avenue Deer Heights to Flint Road Centennial Trail Summit Boulevard Driscoll Alberta to Garland Fish Lake Trail Phase 3B Fisk Lake Trail to Centennial Trail Connection Fort George Wright Freya Street - Garland to Francis Freya Wellesley to Francis Havana Street Sprague to Broadway Maple-Wellesley Intersection Millwood Trail Greene to Felts Field North Bank Trail North River Dr. Sidewalk East of Washington St. Ray/Freya Hartson to 17th Avenue Riverside Ave. Monroe to Division Sherman Ave. / 5th Avenue Traffic Signal Sprague Ave (multiple phases) pavement reconstruction, curb bumpouts, stormwater separation etc. Sunset Highway Bike Path Royal to Deer Heights bike path construction Thor-Freya Reconstruction Sprague to Hartson Wellesley Avenue - Freya to Havana Evaluation Criteria The method of Contractor Selection has not been Determined at this time.
Conceptual
Municipal
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 8, 2020
Multiple Locations, Spokane, WA
Related To This Project
Spokane, WA
Bid Date: Mar 04 2019
Spokane, WA
Bid Date: Mar 25 2019
Spokane, WA
Bid Date: May 20 2019
Spokane, WA
Bid Date: Sep 28 2022
Spokane, WA
Bid Date: Sep 28 2022
Spokane, WA
Bid Date: Aug 24 2022
Spokane, WA
Bid Date: Sep 27 2022
Spokane, WA
Bid Date: Aug 31 2022
Spokane, WA
--
Spokane, WA
Bid Date: Aug 24 2022
Spokane, WA
--
Spokane, WA
Bid Date: Aug 26 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
