BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 13, 2020 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Palm Springs, California. Completed plans call for site work for a water / sewer project.

**As of July 13, 2020 ,this project has not yet been awarded. A timeline for award not yet specified. Engineer Estimated Cost: $2,882,725 to $2,882,725 Pre-Qualification for Bidders: Not Required License Type Required: Class A Contractors Project Duration: 140 Work Days Liquidated Damages: $1,600.00 Per Work Day Bid Bond Percentage: 10% The emergency work consists of the repair and restoration of existing damaged levee sections in addition to necessary facility scour protection in the vicinity of Murray Canyon Drive and Toledo Avenue continuing approximately 800 feet downstream of Araby Drive.

Bid Results

Water / Sewer

$1,876,543.00

Public - County

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
154
Bidding Soon
1,541
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2020

August 31, 2020

Project location map

Multiple Locations, Palm Springs, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.