BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving, asbestos abatement and renovation of a mixed-use development in San Francisco, California. Completed plans call for the renovation of a museum; for asbestos abatement for a museum; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Work to be done under this contract is located at the Hunter's Point Shipyard Building 101 - 101 Horne Ave in San Francisco. Building 101 was built as a Navy Administration Building in 1941. It is a 2 story, 119, 865 sf wood framed building and is located on Horn Ave., within Parcel A of the Shipyard. The work includes but not limited; New ADA ramp at main entry courtyard; Modification of existing auditorium area into a shared art gallery; Code required path of travel upgrades triggered by art gallery construction; Renovation of one set of existing restrooms for ADA compliance and to provide one (1) accessible all- gender facility; Installation of new steel egress stairways and associated foundations for emergency egress; add alternate to replace existing sliding fire separation doors with accessible swinging fire separation doors; add alternate for fire service and fire sprinkler riser for art gallery; hazardous materials abatement and demolition; and all related utility work; and all as shown on the drawings and as specified in these Specifications The time allowed for completion is 273 consecutive calendar days. EDA PROJECT NO. 07-49-05947 & 07-49-06113 Project: F13023; HPNS B101 EXISTING BUILDING SIZE: 8,415 SF APPROX. AT BASEMENT 55,725 SF APPROX. AT 1ST FLOOR 55,725 SF APPROX. AT 2ND FLOOR 119,865 GSF TOTAL For questions, please contact Rafael Gutierrez - (650) 580-0616 rafael.gutierrez@sfdpw.org. A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award Right reserved to reject any or all bids and waive any minor irregularities.

Bid Results

Museum

$3,028,207.00

Public - City

Asbestos Abatement, Paving, Renovation, Site Work

461

34

13

6

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
81
Bidding Soon
1,807
All Active Projects
749
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2020

August 31, 2020

img_map_placeholder

101 Horne Ave, San Francisco, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.