Site work for a water / sewer project in Boise, Idaho. Completed plans call for site work for a water / sewer project.

The project contemplated consists of demolition of a portion of existing 8-inch gravity sewer system and construction of an upsized 12-inch gravity sewer system. Demolition consists of the following: Demolition and removal or abandonment of approximately 915 linear feet of existing 8-inch sewer main. Demolition and removal of approximately 210 linear feet of existing 8-inch sewer main within an existing 30-inch steel casing pipe located beneath Inter state 184. Demolition and removal of three (3) existing manholes. Demolition and removal of the existing flow monitoring manhole with Palmer Bowlus Flume. Demolition and removal of the existing flow diversion manhole. Construction consists of the following: Construction of approximately 800 linear feet of 12-inch gravity sewer main via direct bury trench. Construction of approximately 210 linear feet of 12-inch gravity sewer main within the existing 30-inch steel casing pipe located beneath Interstate 184, and con struction of approximately 70 linear feet of 12-inch gravity sewer main within an existing 24-inch casing pipe located beneath the Brose Irrigation Lateral. Construction of eight (8) precast concrete manholes. Connection to and modification of one (1) existing manhole con crete trough to accommodate flows for the new 12-inch gravity sewer main. Construction of a new flow monitoring manhole with 12-inch Palm er-Bowlus Flume. Relocation of the existing ISCO level sensor and reconnection of the level transmitter field cable and sampler tube to the existing ISCO equipment. Construction of a new concrete diversion manhole. Surface restoration of all disturbed surfaces. Incidentals necessary to complete the work. The Contractor will be responsible for: Obtaining all required permits Developing and implementing traffic control Providing and maintaining all erosion and sediment control Developing and implementing temporary flow bypass during construction. Coordinating construction phasing and system start up with Property Owner and WBSD. The Work will be completed in all respects with Substantial Completion 75 calendar days from the date when Contract Times commence to run and Final Completion 90 calendar days from the date when the Contract Times commence to run, but in no case later than October 30, 2020. If a potential bidder is not able to use the service, please contact Heather Peninger, telephone: (208) 383-6245, fax: (208) 345-5315, e-mail: heather.peninger@jacobs.com for assistance. Owner right is reserved to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents.

Post-Bid

Water / Sewer

$25,000,000.00

Public - City

Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
19
Bidding Soon
349
All Active Projects
131
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 11, 2020

August 10, 2020

October 30, 2020

img_map_placeholder

618 N Allumbaugh St, Boise, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.