Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Fort McCoy, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and bridge / tunnel.
W9128F21B0008 (formally W9128F21R0040) On or about 12 April 2021, this office will issue an Invitation for Bid (IFB) for Rehabilitate Burma Road, Fort McCoy Wisconsin. The solicitation will close on or about 12 May 2021.This solicitation is Unrestricted. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS code 237310 is included in their profile prior to submission of bid. Project Description (approx. quantities): Fort McCoy Directorate of Public Works (DPW) Office recently requested a design to rehabilitation an approximate seven-mile portion of Burma Road. Current roadway surface condition of gravel to remain unchanged. Roadway has large grade changes and areas of steep grades. Currently the roadway is closed during the winter months. DPW request' improve geometrics in order to accommodate an increase in speed limit for both non tactical and tactical vehicles. DPW would also prefer to keep road open during all seasons. No pull-offs or passing lanes are required. There are several intersections with other roadways and with a military vehicle trail that will need to be maintained/altered if there is a grade change that impacts them. DPW indicates there is a buried electric utility line along most if not all of the roadway, and a communication utility line on the opposite side of the road. Probable realignment or replacement of portions of the utilities will be necessary. Geometrics - Where existing horizontal alignment is prohibitive of 45 mph design speed, sign for appropriate speed on curve. Vertical alignment will likely be challenging- preliminary assessment indicates existing grades in excess of 15% in some areas. Design to include determination of largest desired grade based on winter driving conditions, constructability, and economy. Current vertical alignment probably does not meet criteria for stopping sight distance for many sag and crest curves. Grading - Preliminary investigation indicates quite steep grades along sides of roadway, which may result in large cuts and fills if vertical alignment is altered. Clear zone and recoverable slopes for higher speeds will require large grading areas. Guardrail will be included as an option when roadside grading is infeasible or excessive. Drainage - There are few culverts under existing road. Design will include culverts to be replaced or extended (depending on condition). No existing drainage problems (flooding, standing water, etc.) have been evident historically. NEPA documentation will be completed by Fort McCoy DPW. Tank Trail Crossings - There are a few tank trail crossings on Burma Road that will require heavy-duty surface consideration. Tree removal - grading of a safety section (i.e. recoverable foreslopes and adequate clear zone) will require the removal of many trees. Trees will need to be replaced in-kind within the installation. The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 12 months) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required. The above project description is for information only. Project scope of work is subject to change. The estimated construction cost of this project is between $7,500,000 and $10,000,000. Bidders (Offerors): Please be advised of online registration requirement in the SAM, https://www.sam.gov/ and directed solicitation provisions concerning representations and certifications. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM. Obtaining Solicitation Documents: Solicitation documents will be posted to the web via Contract Opportunities (Beta.SAM>Contract Opportunities) at https://beta.sam.gov/searchindex=opp. Find solicitation announcement in Contract Opportunities (https://beta.sam.gov/searchindex=opp): 1. Use the "Keywords" search function to locate the project (by entering the solicitation number) or use the advanced search features offered in the "Federal Organizations" (towards the middle of the page) or use the "Federal Organizations" search feature followed by the "Advanced Search" feature. 2. By using the "Sign In" feature, it allows additional search features and allows you to keep your searches. Sign In might be required on some solicitations that are considered restricted. 3. Once you have located your project, click on hyperlinked title of the solicitation to view the project. Files may be downloaded from the "Attachments/Links" section of the solicitation. Questions should be sent to the Contracting Specialist, Mr. Jae H. Chang, at jae.chang@usace.army.mil. Telephone calls will not be accepted. The method of contractor selection has not been determined at this time.
Bid Results
Roads / Highways
$4,065,200.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2021
August 17, 2021
To Be Determined, Fort McCoy, WI
Related To This Project
Fort McCoy, WI
Bid Date: Apr 20 2021
Fort McCoy, WI
Bid Date: Aug 03 2022
Fort McCoy, WI
Bid Date: Dec 02 2022
Fort McCoy, WI
Bid Date: Jan 04 2023
Fort McCoy, WI
Bid Date: Jan 18 2023
Fort McCoy, WI
Bid Date: May 11 2023
Fort McCoy, WI
Bid Date: Jan 18 2023
Fort McCoy, WI
Bid Date: Mar 16 2022
Fort McCoy, WI
Bid Date: May 04 2021
Fort McCoy, WI
Bid Date: Dec 14 2022
Fort McCoy, WI
Bid Date: Nov 30 2022
Fort McCoy, WI
Bid Date: May 04 2021
Madison, WI
Bid Date: Jan 26 2023
Madison, WI
Bid Date: Nov 29 2022
Janesville, WI
Bid Date: Nov 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.