BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2024 at 8:00 PM

Updated July 17, 2024

Renovation of a water / sewer project in Dubuque, Iowa. Conceptual plans call for the renovation of a water / sewer project.

This project addresses reliability improvements to the Terminal Street Lift Station and Cedar Street Lift Station, as well as, the associated 30-inch diameter Cedar Street and 42-inch diameter Terminal Street force mains that connect the two lift stations to the Water & Resource Recovery Center (WRRC). The original project was developed in FY 2016 to examine the force mains first and lift stations second. However, the priority order was shifted to first examine Terminal Street Lift Station. Funding provides for new sluice gates, pump gates and repairs to the lift station foundation wall along with dry weather pumps and a new wet well to handle smaller average daily flows that will reduce stress and strain on the larger pumps currently in the lift station which are not designed to operate with current daily/low flows. The funds also provide for ancillary improvements including a new gravity sewer connecting the new wet well to the existing lift station influent manhole, a new magnetic flow meter, and hot-tap to the 42-inch FM to allow routing wastewater to the WRRC without it passing through Terminal Street lift station or the valve house. The project funding is also for the replacement of the wet weather pumps, replace piping in the drywell, replacement piping inside Terminal Street lift station that has deteriorated, complete new hardware and protective paint coatings of the lift station mechanical systems along with replacement plumbing and needed electrical improvements and similar improvements to the Valve House. This project will also install camera and audio monitoring at the lift station to reduce in-person staff inspections. This project is included in the city’s fy 2025-2029 Capital Improvement Program. As of July 16, 2024, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$4,858,324.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
94
Bidding Soon
1,164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.