Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Forest Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The work includes, but is not limited to, construction of a potable water service, including earthwork, concrete paving, asphalt paving, water service, soil erosion / sediment control and landscaping, traffic control and protection, and other related work as specified in the plans & specifications. During the bid process, all inquiries must be directed in writing and/or emailed to the District's Purchasing Agent as follows: Purchasing Agent Forest Preserve District of Cook County 69 W Washington Street, Suite 2060 Chicago, IL 60602 Fax: (312) 603-9961 Email: fpd.purchasing@cookcountyil.gov All questions must be received in writing by 5:00 p.m. JUNE 4, 2020. The District seeks the following participation goals with respect to Minority-owned Business Enterprises ("MBE") and Women-owned Business Enterprises ("WBE") for this project: 24 % MBE participation goal and a 10 % WBE participation goal This determination is based upon the scope of work, estimated project cost and the availability of certified MBEs and WBEs that are certified to provide the type of work needed to successfully complete this project. Collectively, MBEs and WBEs shall be deemed "MBE/WBEs". Bidders requiring assistance in meeting these goals are encouraged to contact: Contract Compliance Administrator Forest Preserve District of Cook County (312) 603-8342 Email: sergio.silva@cookcountyil.gov Submission of a Certificate of Intent to Comply With the Cook County Resident Employment is required for all construction projects over $100,000. Work shall be substantially completed within 63 calendar days from the date that the District issues the Notice To Proceed. Substantial completion is the stage in the progress of the Work, as defined in the General Conditions, or a designated portion thereof, that is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. Liquated damages clause in Section GC-4(g) is applicable to the Work. The Contract shall end within 91 calendar days from the Substantial Completion date. The Contract end date is the date on which all Work shall be completed in accordance with the Contract Documents for the referenced project. (Work includes, but is not limited to, request for Final Payment and excludes any warranty related work.)
Post-Bid
Roads / Highways
$300,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 19, 2020
July 20, 2020
2175 S 1st Ave, Forest Park, IL
Related To This Project
Forest Park, IL
Bid Date: Jan 25 2023
Forest Park, IL
Bid Date: Mar 30 2023
Forest Park, IL
Bid Date: Mar 30 2023
Forest Park, IL
Bid Date: Apr 12 2023
Forest Park, IL
Bid Date: Apr 13 2023
Forest Park, IL
Bid Date: Jun 06 2023
Forest Park, IL
--
Forest Park, IL
Bid Date: Jul 27 2023
Forest Park, IL
Bid Date: Jul 12 2019
Forest Park, IL
Bid Date: Aug 30 2022
Forest Park, IL
Bid Date: Aug 18 2022
Forest Park, IL
Bid Date: Aug 02 2022
Forest Park, IL
--
Forest Park, IL
Bid Date: May 24 2022
Forest Park, IL
Bid Date: Jul 05 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.