Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2020 at 8:00 PM

Updated November 15, 2023

Site work and paving for a road / highway in Hollister, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of July 22, 2020, project was awarded to Clean Cut Landscape Incorporated for $1,522,571.50. The project consists of constructing a 10-foot wide 4,841-foot linear River Park Trail between a new 0.32 acre staging area at the southern corner of Bridge Road and Bridgevale Road and the recently constructed Apricot Park. A 10-foot wide pedestrian and bicycle trail will pass under the existing San Juan Hollister Bridge and connect to an existing unpaved levee maintenance road for the Industrial Waste Water Treatment Plant (IWTP) where it will connect to the western end of Apricot Lane and the Apricot Lane Park. The trail will be constructed with base rock overlaid with decomposed granite mixed with beeswax. The beeswax will prevent erosion and reduce maintenance costs. An existing six-foot cyclone perimeter fence on the levees will be relocated to prevent pedestrian access to the IWTP and replaced with an eight-foot wrought iron fence. The west side of the trail will be improved with four-foot high split rail fencing. Existing debris on the southern perimeter of the IWTP includes rip-rap and cement debris that would be relocated to an unused area of the IWTP. Native trees will be planted along the trail to provide shade and enhance habitat. Benches will be installed along the trail. The project would impact approximately 2 acres within the floodplain but does not propose to radically alter the grades or fill to remove the area from the floodplain. There are no habitable structures proposed within the floodplain. Engineers Estimated Cost: $1,515,000 to $1,515,000 Liquidated Damages: $1,000.00 Per Calendar Day Bid Bond Percentage: 10%

Award

Roads / Highways

$1,522,571.00

Public - City

Paving, Site Work

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
143
Bidding Soon
2,434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2020

August 24, 2020

Project location map

River Pkwy, Hollister, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed