BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Kingsbury, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

This construction package consists of drilling and developing Wilcox Water Well No. 1, including pressure cementing, video survey, 36-hour pump test, water quality sampling, downhole equipment, vertical turbine pump and well head completion for Crystal Clear Special Utilities District. The project also consists of clearing and grubbing the water well area and fence lines along the edge of the property and installing barbed wire fence and gates. All questions about the meaning or intent of the Bidding Documents shall be submitted in writing and must be received at least seven calendar days prior to the opening date. Proposals will be received for a single Contract. Proposals shall be provided on a unit price basis as indicated in the Bid Form. Crystal Clear Special Utility District expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities. The project will be awarded to the highest scoring respondent based on set evaluation criteria. A Respondent's failure to respond to the requested qualifications inquiry may result in the proposal being deemed non-responsive. Proposals may be held by Crystal Clear Special Utility District for a period not to exceed 60 days from the date of bid opening for the purpose of reviewing the proposals and evaluating respondent's qualifications prior to the contract award. This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Request for Proposals (RFP) are expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees, are or will be a party to this RFP or any resulting contract. Any contract(s) awarded under this RFP is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and Section 1452(a)(4) of the Safe Drinking Water Act (42 U.S.C. 300j-12(a)(4)), as applicable. This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned business Enterprise (M/WBE) business. EPA rules require that applicants and prime contractors make a good faith effort toward a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. For more details of the DBE Program and the current, applicable, fair share goals. Equal Employment Opportunity and Affirmative Action- All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Any contract awarded under the RFP will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors--Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order No. 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. Davis-Bacon prevailing wage requirements apply. A bid bond in the amount of five percent (5%) of the bid issued by an acceptable surety shall be submitted with each proposal. The successful respondent will be required to furnish a Performance Bond and a Payment Bond, each in the amount of the contract, written by a responsible Surety Company, authorized to do business in the State of Texas. MBE :19.44% WBE : 9.71%

Post-Bid

Water / Sewer

$325,000.00

Public - State/Provincial

Renovation, Site Work

10

1

20

5

Subscribe For Documents

129 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
30
Bidding Soon
2,306
All Active Projects
902
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2020

July 16, 2020

img_map_placeholder

US-90, Kingsbury, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.