Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Minneapolis, Minnesota. Completed plans call for site work for a road / highway; for paving for a sidewalk / parking lot; and water / sewer project.
As of 03/19/2021 Project has been awarded but Contractor’s information is currently not available. The major items of work are approximately: 1 lump sum as built; 1 lump sum mobilization; 1490 lin ft pavement marking removal; 1082 sq ft pavement marking removal; 9 each remove drainage structure; 3 each remove sign type d; 17 each salvage sign type c; 2 each salvage sign type d; 263 lin ft sawing concrete pavement (full depth); 2590 lin ft sawing bituminous pavement (full depth); 209 lin ft remove sewer pipe (storm); 1481 lin ft remove curb and gutter; 170 sq yd remove concrete pavement; 1875 sq yd remove bituminous pavement; 8771 sq ft remove bituminous walk; 8076 sq ft remove concrete walk; 162 sq ft remove concrete driveway pavement; 1 lump sum salvage miscellaneous structures; 1 lump sum haul salvaged material; 668 cu yd aggregate base (cv) class 5; 102 each dowel bar; 202 sq yd concrete pavement 8.0"; 15 each drill and grout dowel bar (epoxy coated); 461 each drill and grout reinforcement bar (epoxy coated); 228 ton type sp 12.5 wearing course mixture (4;l); 337 ton type sp 12.5 non wearing course mixture (5;l); 285 lin ft 15" rc pipe sewer class v; 64 lin ft 18" rc pipe sewer class iii; 1 each connect to existing storm sewer; 8 each connect into existing drainage structure; 27 lin ft plug fill and abandon pipe sewer; 10 each casting assembly; 7 each adjust frame and ring casting; 25.3 lin ft construct drainage structure design n; 19.1 lin ft construct drainage structure design 48-4020; 9169 sq ft 4" concrete walk; 7287 sq ft 6" concrete walk; 4384 sq ft 3" bituminous walk; 140 lin ft concrete curb and gutter design special; 48 lin ft concrete curb and gutter design b424; 16 lin ft concrete curb and gutter design b448; 159 lin ft concrete curb and gutter design b612; 1516 lin ft concrete curb and gutter design b624; 71 lin ft concrete curb and gutter design b648; 170 lin ft concrete curb and gutter design d412; 88 lin ft concrete curb and gutter design d424; 882 sq ft truncated domes; 623 lin ft portable precast concrete barrier design 8337; 560 lin ft relocate portable precast concrete barrier design 8337; 1 lump sum traffic control supervisor; 1 lump sum traffic control; 1 lump sum alternate pedestrian route; 2 each portable changeable message sign; 17 each install sign type c; 2 each install sign type d; 13 each delineator; 296.25 sq ft sign type c; 19 sq ft sign type d; 3 system pedestrian crosswalk flasher system; 2 system revise flasher system; 1 system revise signal system; 55 each storm drain inlet protection; 1290 lin ft sediment control log type straw; 36 each site restoration; 9832 lin ft removable preformed pavement marking tape; 214 lin ft 4" solid line multi-component; 38 lin ft 6" solid line multi-component; 745 lin ft 24" solid line multi-component; 11 lin ft 4" dotted line multi-component; 2209 lin ft 4" double solid line multi-component; 9 lin ft 6" dotted line multi-component ground in (wr); 54 sq ft pavement message preform thermoplastic ground in; 1681 sq ft crosswalk preform thermoplastic ground in; 1020 sq ft pavement marking special 2 thermoplastic. Federal-Aid Construction Contracts (including supportive services), it will affirmatively assure increased participation of minority groups and disadvantaged persons and women in all phases of the highway construction industry, and that on any project constructed pursuant to this advertisement equal employment opportunity will be provided to all persons without regard to their race, color, disability, age, religion, sex or national origin; in accordance with the Minnesota Human Rights Act, Minnesota Statute 363A.08 Unfair Discriminatory Practices, it will affirmatively assure that on any project constructed pursuant to this advertisement equal employment opportunity will be offered to all persons without regard to race, color, creed, religion, national origin, sex, marital status, status with regard to public assistance, membership or activity in a local commission, disability, sexual orientation, or age; in accordance with the Minnesota Human Rights Act, Minnesota Statute 363A.36 Certificates of Compliance for Public Contracts, and 363A.37 Rules for Certificates of Compliance, it will assure that appropriate parties to any contract entered into pursuant to this advertisement possess valid Certificates of Compliance. If you are not a current holder of a compliance certificate issued by the Minnesota Department of Human Rights and intend to bid on any job in this advertisement you must contact the Department of Human Rights immediately for assistance in obtaining a certificate. he following notice from the Minnesota Department of Human Rights applies to all contractors: "It is hereby agreed between the parties that Minnesota Statute, section 363A.36 and Minnesota Rules, parts 5000.3400 to 5000.3600 are incorporated into any contract between these parties based on this specification or any modification of it. A copy of Minnesota Statute 363A.36 and Minnesota Rules, parts 5000.3400 to 5000.3600 is available upon request from the contracting agency." "It is hereby agreed between the parties that this agency will require affirmative action requirements be met by contractors in relation to Minnesota Statute 363A.36 and Minnesota Rules 5000.3600. Failure by a contractor to implement an affirmative action plan or make a good faith effort shall result in revocation of its certificate or revocation of the contract (Minnesota Statute 363A.36, Subd. 2 and 3)." A minimum goal of 13.9% good faith effort to be subcontracted to Disadvantaged Business Enterprises.
Bid Results
Roads / Highways
$1,509,760.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2021
April 5, 2021
Multiple Locations, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Jun 10 2020
Minneapolis, MN
Bid Date: May 19 2020
Minneapolis, MN
Bid Date: May 19 2020
Minneapolis, MN
Bid Date: Jun 01 2020
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Aug 20 2019
Minneapolis, MN
Bid Date: Aug 08 2019
Minneapolis, MN
Bid Date: Jun 29 2020
Minneapolis, MN
Bid Date: Jul 01 2020
Minneapolis, MN
Bid Date: Jul 14 2020
Minneapolis, MN
Bid Date: Jul 14 2020
Minneapolis, MN
Bid Date: Jul 07 2020
Minneapolis, MN
Bid Date: Jul 02 2020
Minneapolis, MN
Bid Date: Jul 07 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.