EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 7, 2020 at 8:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Green Bay, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

For East Campus Drive Improvements NWTC intends to award a con-tract to the lowest responsible bidder meeting specifications on a fixed fee and stipulated sum price the contractor is required to bid where indicated on the NWTC bid form. Any proposal received without the subject line of the email not properly and clearly marked may result in the proposal being reject-ed.It is the responsibility of the bidder to en-sure the proposal is received on time.Any proposals received after the specified due date and time will be rejected. Late proposals will be rejected unopened, regardless of the degree of lateness or the reasons for lateness, including reasons beyond the control of the supplier. The scope of work includes milling existing bituminous pave-ment, grading, curb & gutter, concretesidewalk, asphalt pavement, and landscaping. NWTC supports the promotion and development of Disadvantaged Business Enterprise (DBE) firms and encourages such firms to participate in the invitation to bid on this and other college projects.Bid Security is required. The accepted Bidder(s) will be required to provide a Performance, Labor and Material Payment Bond, and a Certificate of Insurance listing NWTC as "additional insure-d".Bids must be guaranteed for a minimum period of sixty days from the date of bid opening. The Owner reserves the rightto reject any or all bids.

Award

Roads / Highways

$200,421.00

Public - State/Provincial

Paving, Site Work

25

15

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping, Gas and Vapor Process Piping, Liquids Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
21
Bidding Soon
400
All Active Projects
125
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2020

July 9, 2020

img_map_placeholder

Multiple Locations, Green Bay, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.