BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Remodeling of a mixed-use development in Centralia, Illinois. Completed plans call for the remodel of a educational facility.

The Kaskaskia Community College is a 16-building facility established in 1968. The scope of work provides for replacement of the galvanized domestic water distribution system with copper piping throughout the campus. A combined MBE/WBE goal of 15 percent is applicable to the A/E team. A VBE goal of 2 percent is applicable to the A/E team. The public bid opening for PLUMBING and ASBESTOS ABATEMENT will be conducted on Friday, February 4, 2022 at 10:00am prevailing time via WebEx. The public bid opening for GENERAL will be conducted on Friday, February 18, 2022 at 10:00am prevailing time via WebEx. Bids can be sent via the US Post Office, UPS, or FEDEX, and should be sent without a signature required at delivery. Mailed bids will be considered on-time if the package is in CDBs mail received on, or before, the THURSDAY morning following the bid receipt deadline. No confirmation of delivery will be provided to the contractor by CDB. The contractor shall complete all work through Substantial Completion in accord with the contract within 180 consecutive calendar days from the date of the Authorization to Proceed and shall complete all remaining work in accordance with the contract (Final Acceptance) within 45 consecutive calendar days from the date of Substantial Completion. The participation goal percentages on the amount ofthe contract awarded by CDB for this project are: Zero Percent (0%) The participation goal percentages on the amount ofthe contact awarded by CDB for this project are: Five Percent (5%) combined MBE/WBE, No VBE/PBE Goals. Estimated Project Cost: $ 1,000,000 Replacement of existing galvanized domestic water distribution system with new separate copper waterlines to three (3) buildings, in phases. Most of the existing main waterlines in crawlspaces will remain and be abandoned

Bid Results

Water / Sewer

$94,520.00

Public - State/Provincial

Remodeling

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
54
Bidding Soon
628
All Active Projects
261
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2022

April 18, 2022

img_map_placeholder

27210 College Rd, Centralia, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.