BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, paving and new construction of a mixed-use development in Oceanside, California. Design plans call for the construction of a bridge / tunnel; for paving for a bridge / tunnel; and municipal facility.

A public outreach meeting was held on November 10, 2022. The City of Oceanside Mayor and Council Workshop convened on April 26, 2023 to discuss the FY2023-24 Capital Improvements Project Budget, which includes this project; staff will return on June 7, 2023 for final budget adoption. Schematic Design, as well as additional public outreach, feasibility study and alternative selection will continue through Winter 2023. The environmental study is anticipated to be completed by late 2024. Construction documents are expected to be completed in early 2027 with construction to be completed in 2028. *The previous solicitation is listed below for reference The City of Oceanside ("City") is requesting proposals, consisting of a Statement of Qualifications (SOQ) and a Cost Proposal from Architectural and Engineering firms ("Consultant"). The SOQ shall demonstrate qualifications and experience in technical services to complete design work for a bridge and lifeguard headquarters restoration/replacement project. The proposed services by the Consultant will include; relevant elements of civil, structural, mechanical, electrical, water, sewer and architectural design; utility coordination; hydraulic analyses; geotechnical engineering; wave and sea level rise adaptation analysis; final construction plans and documents; cost estimations; bidding and construction administration services; and design schedule. The Consultant shall electronically submit digital plans via Bluebeam for review to the City at the 60%, 90% and 100 % stages including technical specifications and probable opinion of cost; and submit the necessary number of wet signed sets for the building permit review and approval. The project is to restore or replace the concrete portion of the Pier View Way Bridge and the Lifeguard Headquarters. The Oceanside Municipal Pier consists of a concrete structure that spans from the Pier View Way/Pacific Street intersection on the bluff to the wooden pier on the beach and wooden pier from the beach that extends into the ocean. The concrete structure, built in 1926, consists of twin conventionally reinforced bridges, a ramp down to the beach and public restrooms. The restrooms in the concrete structure at the bluff were converted to storage decades ago and in 1985 portions of the substructure closest to the surf were converted into a lifeguard headquarters. The City of Oceanside appreciates your response. Please e-mail the Principal Civil Engineer at dtoschak@oceansideca.org with questions you may have. Reponses to questions received will be posted on online. No questions will be accepted after 4:00 pm June 22, 2020; the last answer set will be posted to online by 4:00 pm June 25, 2020. The City is not responsible for costs associated with the preparation of the proposals; there is no express or implied obligation for the City to reimburse Consultant for any expenses incurred in preparing or submitting an RFP and Proposal. The City reserves the right to accept or reject any and all proposals. Project costs to be announced at a future date. As of May 27, 2020, this project is seeking proposals. Shortlist Notification/Interview Invitations are expected to take place July 16, 2020. Award of Contract is set for September 9, 2020. Bidding for contractor and a firm timeline for construction has not been established.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Municipal

$15,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
105
Bidding Soon
2,321
All Active Projects
1,041
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2027

img_map_placeholder

Multiple Locations, Oceanside, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.