BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Minneapolis, Minnesota. Completed plans call for site work for a road / highway.

The proposed improvements consist of resurfacing the designated alleys with bituminous material (asphalt). To extend the operational life of the concrete alley and to facilitate localized drainage, Public Works recommends that concrete alleys be overlaid with bituminous materials. If an alley has previously been resurfaced, the old bituminous material will be removed down to the original concrete alley before the new surface is placed. The locations of the Alley renovations are within the blocks described below Ward No. From To From To 1 33rd Ave NE 32nd Ave NE Arthur St NE Cleveland St NE 1 28th Ave NE 27th Ave NE Johnson St NE Ulysses St NE 4 Morgan Ave N Logan Ave N 36th Ave N 35th Ave N 4 33rd Ave N Lowry Ave N 6th St N 4th St N 5 Vincent Ave N Upton Ave N 21st Ave N Golden Valley Rd 5 Upton Ave N Thomas Ave N 21st Ave N Golden Valley Rd 9 21st Ave S 22 Ave S 32nd St E 33rd St E 13 Oliver Ave S Newton Ave S 55th St W 56th St W 13 Irving Ave S Humboldt Ave S 56th St W 57th St W The total estimated cost of the alley renovation project is $250,000 At the time of the public hearing, the committee will provide an opportunity for all interested persons to be heard regarding the proposed assessments. You are not required to participate in the live meeting. You may object or comment in writing by sending a written objection or statement to arrive before the public hearing to: councilcomment@minneapolismn.gov or Minneapolis City Clerks Office, C/O POGO Committee Coordinator, 350 S. Fifth St., Room 304, Minneapolis, MN 55415-1382. Assessments of more than $150 are to be collected in 5 annual principal installments on the real estate tax statements beginning in 2021 with interest charged on the assessments at a rate of 3.7%, as determined by the Minneapolis Finance Dept. A person may, at any time during the 5- year period, pay the remaining principal balance of the assessment plus the interest, which has accrued to that point. Assessments of $150 or less are to be collected in their entirety on the 2021 real estate tax statements with interest charged on the assessments at a rate of 3.6%, as determined by the Minneapolis Finance Dept. Prepayment is made to the Minneapolis Finance Department. Pay statements are sent only by request and the taxpayer is solely responsible for obtaining said statement. The Minneapolis City Council has passed Resolutions whereby a deferment of special assessment may be obtained by showing hardship for any homestead property owned by a person 65 years of age or older or retired by a permanent and total disability. For information, email pwspecialassessments@minneapolismn.gov, or call (612)-673-2401. 11888570

Post-Bid

Roads / Highways

$250,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
45
Bidding Soon
773
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2020

July 17, 2020

img_map_placeholder

Multiple Locations, Minneapolis, MN

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.