BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2020 at 8:00 PM

Updated September 9, 2025

Renovation of an educational facility in Danville, Kentucky. Completed plans call for the renovation of a educational facility.

As of 8/3/2020 project was put on a rebid. Rebid date 8/12/2020. The Argo McClure renovation project is in its 4th phase. This phase includes a partial window replacement using new storefront and curtainwall, the prep and painting of existing wood soffits, installing new metal fascia, partial floor abatement and the installation of new flooring in the abated areas, installation of motorized shades, partial HVAC upgrade, partial electrical upgrade, addition of drinking fountains and partial modification to Data/Voice distribution system.

Bid Results

Educational

$418,420.00

Public - State/Provincial

Renovation

20

20

4

11

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
1
Bidding Soon
500
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2020

September 17, 2020

Project location map

303 S 2nd St, Danville, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.