BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Le Mars, Iowa. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; and water / sewer project.

The Extent of the Work Involved for 2020 Industrial Park Grading Project Consist Ofthe Following Approximate Quantities: Strip & Spread Topsoil - 11,087 CY Excavation (includes hauling, placing & compacting 47,191 CY to on-site areas and trucking, placing & compacting 4,100 CY to off-site fill areas) - 51,291 CY Silt Fence - 5,720 LF Seed and Fertilize - 21.58 AC 15" RCP Storm Sewer - 78 LF 4" PCC Trail - 78 LF Each Proposal shall be made on the Proposal form furnished by Schlotfeldt Engineering, Inc. of LeMars, Iowa, Engineers for said City, and must be enclosed in a separate sealed envelope and plainly identified. Each proposal shall be accompanied by a bid bond, certified check, cashier's check, or credit union certified share draft in a separate sealed envelope in an amount equal to five percent (5%) ofthe total amount ofthe bid. The successful bidder shall be required to furnish a "Performance Bond" in an amount equal to one hundred percent (100%) of it's Contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and the maintenance of said Improvements for the City as required by the Specifications. The work listed shall be commenced on or before the date specified by a written Notice to Proceed from the City and shall be completed no later than September 15, 2020. Proposals will be considered by representatives of said City at a meeting to be held at the Municipal Building, LeMars, Iowa, on the day and hour above specified. At 12:00 o'clock P.M. on the 7th day ofJuly, 2020, at said place, the proposals will be considered by the City Council ofsaid City. The successful bidder shall be required to furnish a "Payment Bond" in an amount equal to one hundred percent (100%) of the Contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the prompt payment, as required by the law, of all persons supplying labor and materials in the execution of the work provided for in the Contract. The City reserves the right to reject any or all Proposals, re-advertise for new bids, and to waive informalities that may be in the best interest ofthe City.

Award

Playgrounds / Parks / Athletic Fields

$230,001.00

Public - City

Paving, Site Work

11

9

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
25
Bidding Soon
233
All Active Projects
100
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2020

July 30, 2020

img_map_placeholder

To Be Determined, Le Mars, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.