Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 15, 2025 at 8:00 PM
Updated May 16, 2025
Demolition, site work and new construction of a mixed-use development in Barnstable, Massachusetts. Conceptual plans call for the demolition of a playground / park / athletic field; for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
This funding will facilitate the design and permitting for Hamblin Pond Bathhouse and Site Improvements. This project's scope of work encompasses, but is not limited to, the following key objectives: The existing bathhouse will be demolished to make way for a new, larger facility. This new bathhouse will not only adhere to current building codes and accessibility standards but will also cater to the evolving recreational programming needs of the community. A brand-new pavilion will be constructed, featuring outdoor showers, picnic tables, benches, and landscaping, along with various associated amenities to enhance the park's overall appeal. The entire shoreline of the property will undergo restoration efforts to ensure its preservation and improvement. This includes enhancing the beach's elevation and width, providing an inviting and safe environment for visitors. The project will include reconfiguration and paving of the parking area with accessible walkways. Additionally, efforts will incorporate comprehensive stormwater control measures designed to address current beach erosion issues and prevent stormwater from entering the pond, ensuring the long-term sustainability of the park's natural environment. As of May 15, 2025, this project is included in the Town of Barnstable's Fiscal Year 2026-2030 Capital Improvement Program (CIP) and funding is allotted for design in FY 2026 and construction in FY 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Playgrounds / Parks / Athletic Fields
$1,630,000.00
Public - City
Demolition, New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
415 MA-149, Barnstable, MA
Related To This Project
Barnstable, MA
--
Barnstable, MA
--
Barnstable, MA
--
Barnstable, MA
Bid Date: Jun 21 2024
Barnstable, MA
--
Barnstable, MA
--
Barnstable, MA
--
Installation of Water Service Connections and General Water Works Installation/Maintenance - 5426478
Barnstable, MA
Bid Date: Jun 12 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
