Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a civil project in Salem, Virginia. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; and water / sewer project.
As of March 9, 2022, construction is underway and is anticipated to be complete January 2026. The project adds a third lane on Northbound and Southbound I-81 beginning south of exit 137 and ending north of exit 141, along with improvements to the southbound exit ramp at the exit 137 interchange. Project improvements include but are not limited to: an additional lane in both northbound and southbound directions; two bridges replaced over Wildwood Road (Route 112 - exit 137); two bridges replaced over Goodwin Avenue (Route 635); two bridges replaced over Wildwood Road (Route 619, noting that I-81 crosses Wildwood Road two times); two bridges widened at Thompson Memorial Drive (Route 311- exit 140); asphalt milling and resurfacing of existing pavement; and installation/upgrade of sign structures, guardrail, storm drain pipes, stormwater management facilities, and sound walls. SUBCONTRACTING & MATERIAL SUPPLY OPPORTUNITIES INCLUDE, but are not limited to, the following: Saw & Seal Concrete Paving Joints, Aggregates, Borrow Material, Lime Stabilization, Asphalt Paving, Concrete Paving, Trucking, Storm Drainage, MSE, Sound Wall, SIP, Waterline, Sanitary Sewer, Underdrain Material and Sub, Post Installation Inspection, Utility Test Pits, Concrete Sitework, Concrete Median Barrier, Seeding/Erosion Control, Landscaping, Signage, Electrical, Lighting, Traffic Control Materials/Sub, Fencing, Guardrail, Ready-Mix Concrete, Concrete Slabs, Reinforcing Steel Materials and Tying, Demolition, Piling, Pile Testing, Striping, as well as other opportunities and materials.
Under Construction
Bridges / Tunnels
$178,963,211.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2021
March 1, 2022
I-81, Salem, VA
Related To This Project
Salem, VA
Bid Date: Feb 10 2022
Salem, VA
Bid Date: Dec 17 2021
Salem, VA
Bid Date: Apr 08 2022
Salem, VA
Bid Date: Jun 17 2022
Salem, VA
Bid Date: Apr 27 2022
Salem, VA
Bid Date: Apr 27 2022
Salem, VA
Bid Date: Aug 25 2022
Salem, VA
Bid Date: Mar 04 2022
Salem, VA
Bid Date: Mar 18 2022
Salem, VA
Bid Date: Feb 28 2022
Salem, VA
Bid Date: Mar 17 2021
Salem, VA
Bid Date: Feb 28 2022
Salem, VA
Bid Date: Sep 13 2018
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.