Renovation of an educational facility in Montreal-Ouest, Quebec. Completed plans call for the renovation of a educational facility.

Reference Number : 1645269 Review Title : Major interior renovation and partial replacement of windows. Deadline for receipt of complaints: 2022-10-13 Submission sent electronically accepted: Yes, in a single submission document Phase 1- Basement: Summer 2023 includes basement work, which must be performed during the school's summer holidays. start date June 26, 2023 end date August 20, 2023 . The work can also be done during weekends and construction holidays, but in accordance with SQC regulations and those of the competent authorities. Phase 2- Ground floor and upper floor: summer 2024 includes work on the ground floor and upper floor, which must be carried out during the school's summer holidays, start date June 24, 2024 scheduled end date August 18, 2024 . The work can also be done during weekends and construction holidays, but in accordance with SQC regulations and those of the competent authorities. Certain works which do not affect the operation of the school may be carried out beyond the end date of each phase subject to the approval of the Client, these works must be carried out after the hours of the school and on weekends according to the schedule detailed in 3.3 of the specific requirements. The date of substantial completion of the work is scheduled for October 18, 2024. Correction of deficiencies must be completed no later than November 8, 2024 The final acceptance of the works is scheduled for December 2, 2024 Note that the presence of the person in charge (concierge) of the EMSB is required throughout the work, the time spent after the regular schedule will be billed to the Contractor according to the rates indicated in 3.3 of the Special Requirements. The premises should be safe for use by users at the end of each phase. The heating system must be in operation from October 1 following the end of each phase.

Award

Educational

$5,069,990.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
119
Bidding Soon
1,602
All Active Projects
663
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2022

June 26, 2023

img_map_placeholder

314 Northview St, Montreal-Ouest, QC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.