Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 12, 2020 at 8:00 PM

Updated November 15, 2023

Site work for a road / highway in Medina, Ohio. Completed plans call for site work for a road / highway.

Said improvement will involve the removal of the existing 66" corrugated metal pipe and installation of a new 72" corrugated metal pipe culvert including premium bedding & backfill, concrete footers & wingwalls, ditching ,ditch enclosures, guardrail, asphalt pavement and general excavation involving ditch realignment & fine grading in preparation of seeding and incorporating stipulated traffic control in accordance with the specifications and accompanying construction drawings. The road shall be closed for a maximum of 45 calendar days and the project completion date shall be October 9th, 2020.

Bid Results

Roads / Highways

$98,890.00

Public - County

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
150
Bidding Soon
2,401
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2020

July 13, 2020

Project location map

To Be Determined, Medina, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed