EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 22, 2020 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Slatington, Pennsylvania. Working plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; and sidewalk / parking lot.

**As of September 22, 2020, the bid was rejected and project will go for a re-bid. A timeline for a rebid is not yet determined.** Clarification Deadline: 8/24/2020 2:00 PM The Work to be performed for the 2019 CDBG Memorial Park Improvements Project consists of the following: Provide materials and labor to add additional parking to Memorial Park and construct ADA ramps, as more particularly specified in the Contract Documents. The Bid for the 2019 CDBG Memorial Park Improvements Project (PROJECT) shall be accompanied by a Bid Security in the amount of ten percent (10%) of the total amount of the Bid in the form of a certified check, bank money order, or bid bond. All Bids shall be effective for sixty (60) calendar days from the date of the Bid opening, unless an award of the contract is delayed by the required approval of another government agency, the sale of bonds or the award of a grant, in which case all bids shall remain effective for one hundred twenty (120) calendar days from the date of the Bid opening. On or before the last day during which bids shall be effective, if a contract will be awarded it shall be awarded to the lowest responsible bidder. After issuance of the Notice of Award, such contract must be completed within 60 calendar days from the date of the Notice to Proceed. The successful bidders will be required to provide Construction Performance and Payment Bonds equal to 100% of the contract amount as specified in the contract documents, which bonds shall also cover a 1-year correction period which will commence upon completion of the Work. This project is subject to certain special requirements. For example, as more specifically detailed in the Contract Documents, the successful bidder shall be required to (a) assure protection against discrimination for employees, applicants for employment, and subcontractors on the grounds of actual or perceived race, color, sex, religion, ancestry, genetic information, national origin, sexual orientation, gender identity or expression, familial status, marital status, age, mental or physical disability, use of guide or support animals and/or mechanical aids; (b) pay certain minimum salaries and wages; and ( c) demonstrate compliance with special solicitation requirements intended to promote use of disadvantaged business enterprises which include certain qualified business and minority and women-owned enterprises during the bidding process OWNER reserves the right to accept or reject any or all Bids or portions thereof. All Proposals shall be submitted exclusively Proposals provided by any other means will not be accepted. All proposals must be labeled "Proposal for 2019 CDBG Memorial Park Improvements" and submitted in PDF format. Incomplete proposals and those received after the specified date and time will not be considered. Hand delivered, mailed, courier, faxed and/or emailed responses will not be accepted. Upon OWNER's request, Bidders must deliver the original bid security within seventy-two (72) hours (weekends and holidays excluded) of a demand for same.

Final Planning

Playgrounds / Parks / Athletic Fields

$107,123.00

Public - City

Paving, Site Work

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Allowances, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Quality Control, Temporary Facilities and Controls, Construction Facilities, Vehicular Access and Parking, Traffic Control, Product Requirements, Product Options, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
317
Active Projects
177
Bidding Soon
2,650
All Active Projects
1,192
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2020

March 22, 2021

img_map_placeholder

To Be Determined, Slatington, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2019 CDBG Memorial Park Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.