Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 1, 2020 at 8:00 PM
Updated November 15, 2023
Site work, paving and outdoor lighting for a civil project in Winter Garden, Florida. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and for outdoor lighting for a road / highway.
There is no architect chosen since it is civil project. Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Oral Presentation PD&E Widen Western Betlway & Poinciana Pkwy Extension TRC Members (Subject to Change) : Annemarie Hammond Carol Scott Rax Jung The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. This contact contains two PD&E Studies.: 1) Widen Western Beltway (SR 429) from Interstate 4 (I-4)/SR 400 to Seidel Road in Orange and Osceola Counties. 2) Poinciana Parkway (SR 538) Extension from CR 532 to I-4/SR 429 in Osceola County. Improvements and modifications to the existing interchanges , including I-4, Sinclair Road, US192/SR 530, Western Way, and Seidel Road within the project limits, as well as possible future access locations will be studied. This contract may include a future option for design services. FPID: 446164-1-22-01; 446581-1-22-01 Technical Panel Session were held on Monday, 5/4/2020. Interested firms should follow the planned ad as this date is subject to change. Contact Cyrena Kosmidis for registration at (407) 264-3490 or email Cyrena.Kosmidis@dot.state.fl.us. Each session will be limited to 30 minutes. The PM, TRC members and technical staff will be available to answer your project specific questions. Due to limited time of each session, marketing is not encouraged. Attending a technical panel session is not a requirement to submit a LOR. When submitting your LOR, please name your file(s) using the following format to include the Ad number and your firm name: I.E. "218XX - FIRM NAME - LOR" Debrief meetings with the TRC will be held on Monday 8/31/2020. Interested firms should contact Deb McGlashan at Deborah.McGlashan@dot.state.fl.us to register for a 30-minute session. FDOT is working on an initiative to condense the procurement process and shorten the time frame needed to execute contracts, therefore this procurement is anticipated to be completed in 7 months. Longlist Date/Time 6/23/2020 08:30 pm Shortlist Selection Date/Time 6/30/2020 08:30 pm Technical Review Committee Meeting 1 Date/Time 8/05/2020 12:30 am Final Selection Date/Time 8/25/2020 11:00 pm Negotiations Period Begin Date 8/27/2020 Negotiations Period Ending Date 1/01/2021 The method of contractor selection has not been determined at this time. RFP Engineering - PD and E Widen Western Betlway and Poinciana Parkway Extension
Design
Bridges / Tunnels
$7,500,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2021
Multiple Locations, Winter Garden, FL
Related To This Project
Winter Garden, FL
--
Winter Garden, FL
Bid Date: Jun 16 2020
Winter Garden, FL
--
Winter Garden, FL
Bid Date: Oct 31 2023
Winter Garden, FL
Bid Date: Oct 27 2023
Winter Garden, FL
Bid Date: Nov 08 2023
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
Bid Date: Mar 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
