BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Winter Garden, Florida. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and for outdoor lighting for a road / highway.

There is no architect chosen since it is civil project. Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Oral Presentation PD&E Widen Western Betlway & Poinciana Pkwy Extension TRC Members (Subject to Change) : Annemarie Hammond Carol Scott Rax Jung The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. This contact contains two PD&E Studies.: 1) Widen Western Beltway (SR 429) from Interstate 4 (I-4)/SR 400 to Seidel Road in Orange and Osceola Counties. 2) Poinciana Parkway (SR 538) Extension from CR 532 to I-4/SR 429 in Osceola County. Improvements and modifications to the existing interchanges , including I-4, Sinclair Road, US192/SR 530, Western Way, and Seidel Road within the project limits, as well as possible future access locations will be studied. This contract may include a future option for design services. FPID: 446164-1-22-01; 446581-1-22-01 Technical Panel Session were held on Monday, 5/4/2020. Interested firms should follow the planned ad as this date is subject to change. Contact Cyrena Kosmidis for registration at (407) 264-3490 or email Cyrena.Kosmidis@dot.state.fl.us. Each session will be limited to 30 minutes. The PM, TRC members and technical staff will be available to answer your project specific questions. Due to limited time of each session, marketing is not encouraged. Attending a technical panel session is not a requirement to submit a LOR. When submitting your LOR, please name your file(s) using the following format to include the Ad number and your firm name: I.E. "218XX - FIRM NAME - LOR" Debrief meetings with the TRC will be held on Monday 8/31/2020. Interested firms should contact Deb McGlashan at Deborah.McGlashan@dot.state.fl.us to register for a 30-minute session. FDOT is working on an initiative to condense the procurement process and shorten the time frame needed to execute contracts, therefore this procurement is anticipated to be completed in 7 months. Longlist Date/Time 6/23/2020 08:30 pm Shortlist Selection Date/Time 6/30/2020 08:30 pm Technical Review Committee Meeting 1 Date/Time 8/05/2020 12:30 am Final Selection Date/Time 8/25/2020 11:00 pm Negotiations Period Begin Date 8/27/2020 Negotiations Period Ending Date 1/01/2021 The method of contractor selection has not been determined at this time. RFP Engineering - PD and E Widen Western Betlway and Poinciana Parkway Extension

Design

Bridges / Tunnels

$7,500,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
71
Bidding Soon
1,468
All Active Projects
612
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2021

img_map_placeholder

Multiple Locations, Winter Garden, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.