Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to a military facility in Fort Lupton, Colorado. Completed plans call for the addition of a military facility; for the demolition of a military facility; for the renovation of a military facility; and for site work for a military facility.
The scope of services will include assistance to the State during the process of assessment, design, construction, and warranty period. Specific tasks to be performed by the Construction Manager/General Contractor (CM/GC) include those generally performed by the CM/GC construction community where the Construction Manager is also the Contractor. A sample copy of the State CM/GC contract is contained within the RFP. A Guaranteed Maximum Price (GMP) will be required at the completion of 65% Design Document phase. The State of Colorado, Department of Military and Veterans Affairs (DMVA) is soliciting the submittal of proposals from firms to provide Construction Management/General Contracting (CM/GC) services for building and site expansion at the Colorado Army National Guard (COARNG) Fort Lupton Readiness Center. The Readiness Center (RC) was constructed in 2011, and was Master Planned for expansion to house a second COARNG unit. In order to accommodate the incoming unit the existing Readiness Center will be expanded by approximately 7,428 SF for storage and locker room space. Approximately 994 SF of the existing facility will be altered for an enlarged PT room, and increased space in the Womens restroom. A detached 5,298 SF General Training Work Bay building will be provided, that will include vehicle bays, office and storage space, tool room, and restrooms. The project will also include a 5,109 SF unheated vehicle storage building. The Fort Lupton RC secured motor pool parking area and access road will be enlarged by 6,696 SY to accommodate the incoming additional military vehicles. The visitor/user parking lot (POV) will be increased by 3,079 SY. Anti-terrorism and force protection (AT/FP) measures will be incorporated into the project, including stand-off distances, bollards, perimeter security fencing, and access controlled vehicle gates. The frontage along the west side of County Road 31 needs to be bermed and landscaped to partially screen the view of the military vehicles from the county road. DD forms 1390/91 list the Fort Lupton Readiness Center Addition and Alteration total construction cost at approximately $8.0M. Respondent initiated email requests for clarification will be received any time on or before 30 June 2020 at 2:00 PM. All State responses will be issued by email addenda on or before 2 July 2020 at 11:00 AM.
Award
Military
$28,559.00
Public - Federal
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 13, 2020
March 12, 2021
2930 9th St, Fort Lupton, CO
Related To This Project
Fort Lupton, CO
--
Fort Lupton, CO
--
Fort Lupton, CO
--
Fort Lupton, CO
--
Fort Lupton, CO
--
Fort Lupton, CO
--
Fort Lupton, CO
Bid Date: Feb 18 2022
Fort Lupton, CO
--
Fort Lupton, CO
Bid Date: Sep 20 2023
Fort Lupton, CO
--
Fort Lupton, CO
Bid Date: Sep 13 2023
Fort Lupton, CO
Bid Date: Sep 14 2023
Fort Lupton, CO
Bid Date: Feb 09 2024
Fort Lupton, CO
--
Fort Lupton, CO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.