Demolition, site work, paving and new construction of a bridge / tunnel in San Diego, California. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Update: Construct a new bridge to replace the existing bridge on Sycamore Drive over San Marcos Creek. Project is included San Diego County Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update:https://www.sandiegocounty.gov/content/dam/sdc/dpw/ENGINEERING_SERVICES/5-Year/CIP%20Capital%20Improvement%20Plan%202024-25%20to%202028-29.pdf Construct a new bridge to replace the existing bridge on Sycamore Drive over San Marcos Creek. Project is included San Diego County Fiscal Year 2025-2029 Page no 30 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE: https://www.sandiegocounty.gov/content/dam/sdc/dpw/CIP%20Capital%20Improvement%20Plan%202023-24%20to%202027-28.pdf Construct a new bridge to replace the existing bridge on Sycamore Drive over San Marcos Creek. Project is in San Diego County capital budget fy 2023-2028 CIP 64 ____________________________________________________________________________________________________________ This project will construct a new bridge to replace the existing bridge on Sycamore Drive over San Marcos Creek. This project was requested to meet federal bridge requirements. This project is included in the San Diego County's FY 2021-2025 Capital Improvement Plan (CIP). As of March 9, 2022, information regarding a design team and a general contractor is not available Construction is anticipated from FY 2022 to FY 2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$12,300,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
127
Bidding Soon
1,311
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

Sycamore Dr, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.