BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Muncie, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City of Muncie, Indiana (Owner) is requesting Bids for the construction of the following Project: Public Resurfacing and Road Improvements The Project includes the following Work: The scope of work expected under this contract includes: The project includes W, 7th St. from S. Batavia Ave. to S. Gilman Ave., W. Main St. from S. McKinley Ave. to S. Calvert St., W. 13th St. from S. Port Ave. to S. Rochester Ave., S. Utica Ave. from W. 8th St. to W. Memorial Dr., N. Garnet Ave. from E. Waid Ave. to the dead end of the road, 5. High St. from W. Memorial Dr. to W. 9th St., E. Charles St, from S. Rackley St to S. Beacon St., S. Graceland Ave. from W. Jackson St. to W. Main St., and N. Monroe St. from E. Gilbert St. to E. Washington St., all locations within the City of Muncie, Indiana. The scope of work for each of the above listed sites consists at various locations of: milling and resurfacing, full depth patching of hot mix asphalt, patching of hot mix asphalt to achieve level at-grade surfaces, removing and replacing existing gravel surfaces with full depth hot mix asphalt, cleaning and removing debris from existing inlets and resetting the casting, removing existing trees, removing and replacing existing sidewalk, removing and replacing existing curb, restoring existing curb, constructing new curb, constructing new accessible curb ramps, adding detectable warning strips to existing accessible curb ramps, and removing and replacing existing driveways within the right-of-way. The work also includes various coordination with 3rd parties for replacing existing storm sewer infrastructure and adjusting casting rims to match finished road surfaces. Bids are requested for the following Contract: City of Muncie Board of Public Works and Safety Public Resurfacing and Road Improvements Owner anticipates that the Project's total bid price will be approximately $1.4 Million. The Project is expected to reach substantial completion by November 20, 2020 with final completion by December 18, 2020. The Issuing Office for the Bidding Documents is: Street Department of City of Muncie 5790 W. Kilgore Muncie, IN 47304 For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the instructions to Bidders that are included in the Bidding Documents.

Award

Roads / Highways

$1,400,000.00

Public - City

Paving, Site Work

30

22

6

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
40
Bidding Soon
1,145
All Active Projects
449
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2020

August 31, 2020

img_map_placeholder

Multiple Locations, Muncie, IN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.