BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a pre-engineered storage facility in Heron Lake, Minnesota. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and for paving for a pre-engineered storage facility.

On-Line Bidding: Available No pre-bid meeting The work will be done under one prime contract that includes: General construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolition of existing fabric covered truss arch system, includes fabric, steel framing, concrete piers, and concrete footings and precast T-panels. 2. Construction of a nominal 55 feet wide by 70 feet long fabric covered pre-engineered metal building system: includes engineering analysis, design and construction of foundation, concrete piers, and fabric covered steel framed system, including precast bunker panels. Bituminous paving included. 3. Engineering analysis and design. a. Analysis and design shall be completed within 30 days of the Notice Proceed Plans and Specifications may be viewed, without charge, on the Office of State Procurement on Virtual Cost is $31 for Non-Subscriber who responds, $6 charge is paid at time of download, and remaining charges are paid when the response is uploaded. Cost is $25 for Subscriber who responds, charges are paid when the response is uploaded. Cost is $6 for Non-Subscriber who downloads but does NOT respond. Cost is $0 for Subscriber who downloads but does NOT respond. Plan Holders will be notified via email as addenda are issued. Parties that download the plans and specifications and need to have them printed elsewhere are solely responsible for those printing costs. Paper copies of plans and specifications will not be distributed by the Owner or its agent(s).

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$355,942.00

Public - State/Provincial

New Construction, Paving, Site Work

6

15

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
13
Bidding Soon
188
All Active Projects
79
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2020

July 24, 2020

img_map_placeholder

MN-60 & Co Hwy 9, Heron Lake, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.