BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in O Fallon, Illinois. Design plans call for site work for a road / highway; and for paving for a road / highway.

This project may contain Federal Funds. This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all subconsultants the prime Consultant will be using are scheduled to attend an initial meeting on August 5, 2020 at 9:00 AM at the Region Five/District Eight Office in Collinsville. This project consists of the widening of Interstate 64 from Green Mount Road to 1.1 miles west of IL 158 to accommodate 6 lanes of traffic and bridge repair to S.N. 082-0181 carrying Lincoln Ave over I-64. The scope also includes improving the intersections of the I-64 ramps with Green Mount Road. Phase II engineering services required for this project include preparation of all Plans, Specifications & Estimates (PS&E documents) to widen I-64 to six lanes and upgrade Green Mount Road ramps. This includes roadway and structure plans, maintenance of traffic plans, drainage plans, storm water pollution prevention plan, erosion control plans, traffic signal plans and could include highway signing plans and noise wall plans. The completion date for this contract will be 60 months after authorization to proceed. The prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Structures (Highway: Typical) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment at the following address through the Engineering and Prequalification Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 56 - RFQ Engineering - FAI 64 (I-64), Phase II Engineering Services

Design

Roads / Highways

$34,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
41
Bidding Soon
797
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2021

img_map_placeholder

I-64, O Fallon, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.