Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2020 at 8:00 PM

Updated November 15, 2023

Site work and paving for a road / highway in O Fallon, Illinois. Design plans call for site work for a road / highway; and for paving for a road / highway.

This project may contain Federal Funds. This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all subconsultants the prime Consultant will be using are scheduled to attend an initial meeting on August 5, 2020 at 9:00 AM at the Region Five/District Eight Office in Collinsville. This project consists of the widening of Interstate 64 from Green Mount Road to 1.1 miles west of IL 158 to accommodate 6 lanes of traffic and bridge repair to S.N. 082-0181 carrying Lincoln Ave over I-64. The scope also includes improving the intersections of the I-64 ramps with Green Mount Road. Phase II engineering services required for this project include preparation of all Plans, Specifications & Estimates (PS&E documents) to widen I-64 to six lanes and upgrade Green Mount Road ramps. This includes roadway and structure plans, maintenance of traffic plans, drainage plans, storm water pollution prevention plan, erosion control plans, traffic signal plans and could include highway signing plans and noise wall plans. The completion date for this contract will be 60 months after authorization to proceed. The prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Structures (Highway: Typical) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment at the following address through the Engineering and Prequalification Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 56 - RFQ Engineering - FAI 64 (I-64), Phase II Engineering Services

Design

Roads / Highways

$34,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
95
Bidding Soon
1,605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2021

Project location map

I-64, O Fallon, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed