BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Canyon Lake, Texas. Completed plans call for site work for a water / sewer project.

New Braunfels Utilities invites the submittal of responses to this Request for Proposals (RFP) from qualified firms interested in providing construction services in connection with the installation of approximately 6,300 linear feet ("LF") of 33 inch sanitary sewer line to include a 750 LF siphon across the Guadalupe River using horizontal directional drilling, and 2,250 LF of microtunneling under the City of New Braunfels' right-of-way and open cut installation with an average depth of 20 vertical feet ("VF"). Approximately 300 LF of sewer line will be replaced in place and by-pass pumping will be required. An existing 30 inch sewer pipe under Schlitterbahn shall be inspected and rehabbed using cured in place pipe ("CIPP"). NBU has established a target commencement date for construction activities as September 15, 2020. The projected substantial completion date is estimated to be June 30, 2021, with a final completion date of January 28, 2022. NBU reserves the right to phase the construction of the Project or modify the schedule as needed and determined by the NBU Board or staff due to modifications in scope. Each proposal must be accompanied by an approved Bid Bond in the amount of 5% of the proposal cost, payable to the New Braunfels Utilities without recourse, as a guarantee respondent will enter into a contract at the stated price. Questions regarding this RFP or the services requested must be sent to the Manager of Purchasing purchasing@nbutexas.com before June 24, 2020, at 2:00 p.m. CST. The Board of Trustees of New Braunfels Utilities reserves the right to reject any or all of the proposals, to waive formalities, and to make an award to an Offeror in the order of ranking as outlined in this RFP and that the Board of Trustees determines will be the best value to New Braunfels Utilities. Location The facility sewer line will start at the aerial crossing at Prince Solms Park, follow along Liebscher Road, E. South Street, Washington Avenue, and Cross River Street in New Braunfels, Texas. Estimated maximum construction budget is approximately $7,281,000. This includes all incidental and contingent expenses associated with the construction ofthe Project.

Bid Results

Water / Sewer

$11,864,524.00

Public - City

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
43
Bidding Soon
2,347
All Active Projects
802
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2020

September 15, 2020

img_map_placeholder

Multiple Locations, Canyon Lake, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.