BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2020 at 8:00 PM

Updated September 14, 2023

Renovation of a fire / police facility in Edmonton, Alberta. Completed plans call for the renovation of a fire / police facility.

The scope of this project includes a complete replacement of the fire alarm system. This includes all fire alarm control and annunciator panels, initiating and signaling devices and all necessary conduit, wiring etc. It is important to note that the scope does not include any sprinkler piping, pumps, or piping components. However, all wiring and switched of the fire alarm system connected to mechanical equipment (such as tampers and flow switches) are to be included in the scope. Question Acceptance Deadline: Jun 22, 2020 02:00 PM MDT Documents are available at : https://www.bgis.merx.com/

Award

Fire / Police

$55,975.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
31
Bidding Soon
562
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2020

July 29, 2020

Project location map

11140 109 St NW, Edmonton, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.