BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Glendale, Arizona. Completed plans call for site work for a water / sewer project.

As of date this project has not been awarded to a General Contractor. A timeline for award has not yet been established. As of December 7, 2021, this project has not yet been awarded. The project is expected to be awarded in early 2022. The City of Glendale is seeking a qualified construction manager/general contractor to provide design phase assistance and construction services as the Construction Manager at Risk (CMAR) for a City of Glendale project for storm drain improvements on 47th and 51st Avenues, between Maryland and Grand Avenues, and on Grand Avenue between 47th and 51st Avenues. The construction cost for this project is estimated at +/- $10M, depending on final design. The City is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction and construction services during the design and construction phases of this project. The City entered into a professional services agreement with an engineering firm for the preliminary design for the scoping of this project. The CMAR will work closely with and be an integral part of the design team during the design phase of this project. The CMAR begins with the firm in an agency support role for pre-construction services. At some point prior to construction, the CMAR will assume the risk of delivering the project through a guaranteed maximum price (GMP) contract. The CMAR will be responsible for construction means and methods. The CMAR will also work closely with the City and design engineering firm during the design and construction phases of this project. Questions pertaining to the RFQ or selection process should be directed in writing to the Engineering Department, City of Glendale, 5850 West Glendale Avenue, Glendale, AZ 85301, or by email to EngineeringDept@glendaleaz.com. Because City staff may not have time to respond to individual inquiries regarding the scope outside of this presubmittal conference, it is recommended that interested firms send a representative to the pre-submittal conference.

Post-Bid

Water / Sewer

$10,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
11
Bidding Soon
698
All Active Projects
243
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2021

July 25, 2022

img_map_placeholder

W Bethany Home Rd, Glendale, AZ

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.