Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2026 at 8:00 PM

Updated July 29, 2026

Site work for a power facility in Wellfleet, Nebraska. Completed plans call for site work for a power facility.

Plans to construct a 345,000 volt transmission line from NPPD Gerald Gentleman Station near Sutherland to NPPD existing substation east of Thedford. The new line will then proceed east and connect to a second substation to be sited in Holt County. As of August 15, 2024, a general contractor has been selected, but the project is currently on hold. Construction has been temporarily halted due to an injunction. The owner is waiting to go back to court to have it remove and continue construction.

Under Construction

Power Plant

$264,999,990.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
7
Bidding Soon
113
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2026

Project location map

To Be Determined, Wellfleet, NE


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed