BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 4, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a bridge / tunnel in Fort St. John, British Columbia. Conceptual plans call for site work for a bridge / tunnel.

Work includes: Sort, haul and place of riprap from Stockpile site(s). Construction of a temporary diversion channel and flow diversion of Montney (St John) Creek. Construction of soil wraps, fish habitat enhancement features including large woody debris and boulder cluster features. Project is located offline from the existing 103 Cecil Lake Road at the St John Bridge No. 1, 9km east of Fort St John. LKI Rout ID: 944, Segment No. 1178, Distance: 6.47km. TIMELINE: Tender has been cancelled. If/when the project will be re-tendered is undetermined at this time. Project may be updated when it has been approved to bid for construction. Coverage is discontinued at this time.

Project Abandoned

Bridges / Tunnels

Public - State/Provincial

Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
3
Bidding Soon
59
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2020

October 2, 2023

Project location map

Multiple Locations, Fort St. John, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.