BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2020 at 7:00 PM

Updated April 3, 2025

Site work for a water / sewer project in Spring, Texas. Completed plans call for site work for a water / sewer project.

Rehabilitate 8-inch thru 12-inch sanitary sewer lines using CIPP, Pipe Bursting, and Point Repair methods. Each bid proposal must be accompanied by a Bid Bond from a reliable surety company drawn to the order of Prestonwood Forest Utility District in the amount of five percent (5%) of the total bid. No bid proposal may be withdrawn for a period of sixty (60) days after the bid opening date. The OWNER reserves the right to reject any or all bids or to accept the bid deemed most advantageous to it. The successful bidder will be required to provide a performance, payment, and maintenance bond for the full amount of the contract.

Under Construction

Water / Sewer

$156,375.00

Public - County

Site Work

8

10

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
388
Active Projects
189
Bidding Soon
3,787
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.