BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2025 at 8:00 PM

Updated March 27, 2025

Site work and paving for a mixed-use development in New Britain, Connecticut. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; water / sewer project; and sidewalk / parking lot.

**As of March 26, 2025, this project has not yet been awarded. A timeline for award has not yet been established. Beeline Trail Phase 1 The scope of work generally consists of the construction of the first phase of the Beeline Trail which includes approximately 4,300 linear feet of paved multi-use trail beginning on the southerly side of West Main Street (SR 555) just east of the Route 72 eastbound overpass, Bridge No. 02913, and continuing in an easterly direction along the southerly side of Route 72 behind the local businesses. The trail will cross both Curtis Street and Grove Hill and will then continue along the southerly side of Lenox Place, heading east to the intersection of Lake Street and Columbus Boulevard. It will then cross over to the northernly side of Columbus Boulevard and continue to the project limits at Washington Street. The proposed project is intended to provide a connection between the Beeline Trail Phase 2 project at the westerly limits and the recently constructed section of Beeline Trail at the easterly limits. The construction of this project includes a paved multi-use trail, limited drainage improvements, fencing, curbing, concrete sidewalks, retaining walls, construction of a small parking lot, street trees, minor landscaping, application of painted mural and restoration of disturbed areas. Some functional and aesthetic amenities such as benches, bike racks, fencing and landscaping will be included as part of this project. Question Deadline 01/10/2025 Every request for such interpretation should be made in writing addressed to the Owner, and, to be given consideration, must be received at least ten days prior to the scheduled bid opening. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Post-Bid

Roads / Highways

$3,800,000.00

Public - City

Paving, Site Work

140

11

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
941
Active Projects
458
Bidding Soon
7,380
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 24, 2025

Project location map

Multiple Locations, New Britain, CT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.