Site work and paving for a mixed-use development in Cottage Grove, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

2 nd Addition Final Street Improvements: In general, Work consists of the following approximate quantities: 12,550 LF Remove Bituminous Wedge 400 LF Concrete Curb and Gutter 800 SF Concrete Sidewalk 40 EA Adjust Manholes Frame and Casting 20,600 SY Bituminous Wearing Course Mixture Along with all related work, appurtenances, services, erosion control and restoration Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders.The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids.The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. Description of Work: This Project consists of the removing and replacing damaged concrete curb/gutter and sidewalk, removing the bituminous wedge, adjusting gate valves and manholes, placing bituminous tack coat, placing virgin bituminous wear and final restoration in the City of Cottage Grove, Minnesota: 1. Traffic Control and Access: a. Access to the Site will be provided from Hadley Avenue South or 95th Street South. 2. Erosion Control: a. Erosion will be closely monitored once construction begins. Specific erosion control measures will be implemented if deemed necessary by the Engineer upon experiencing actual field and construction conditions. b. Contractor shall exercise care in preserving downstream pond and wetland water quality. It is expected that adjacent storm sewer systems will be protected from sediment and from excavation materials. Location: Cottage Grove, Minnesota. The general Site is located on the west side of Hadley Avenue South and north of 95th Street South.

Award

Roads / Highways

$254,718.00

Public - City

Paving, Site Work

8

15

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
46
Bidding Soon
800
All Active Projects
351
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2020

August 17, 2020

img_map_placeholder

Multiple Locations, Cottage Grove, MN


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.