BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a transportation facility in Fletcher, North Carolina. Completed plans call for the demolition of a transportation facility; for the construction of a transportation facility; and for site work for a transportation facility.

As of February 21, 2023, a general contractor has been awarded and this project is under construction. General contractor information has not been determined. *The closed solicitation has been included below for reference: The Greater Asheville Regional Airport Authority (Authority) is requesting Statements of Qualification from Consulting firms and teams interested in providing professional consulting services required for the selection, design, and construction of a replacement air traffic control tower and associated facilities, including the terminal radar approach control and associated base building, and all required infrastructure and equipment. Firms and/or teams submitting SOQs are expected to have extensive, recent and direct experience in the planning, design, and construction of civil, architectural, electrical, mechanical, structural, DBE elements, and specialty equipment anticipated for this project. Firms shall also be familiar with design and equipment requirements for FAA operated air traffic control facilities, including coordination and approval requirements to ensure an efficient design and approval process that meets all FAA requirements. Firms may present project teams consisting of the proposing firms and appropriate subconsultants such that the teams have the necessary depth and breadth of experience appropriate for the project. All work shall be accomplished in accordance with the relevant FAA design and minimum equipment criteria, shall follow all required FAA protocols, and approval processes. It is the policy of the Authority that Disadvantaged Business Enterprises (DBE's), certified by the State or another recognized agency in accordance with 49 CFR Part 26, shall have the maximum opportunity to compete for awarding of contracts as professional, technical and non-technical service providers to the Authority. The overall DBE Goal for the Greater Asheville Regional Airport for FY 20/21 is 12.2 percent, and consideration to meeting this goal shall be included in all submittals. For additional information, contact the Greater Asheville Regional Airport Authority Planning Manager Jared Merrill at (828) 209-5113 or jmerrill@flyavl.com. Questions concerning this Request for Statements of Qualifications must be submitted in writing to Mr. Jared Merrill, Planning Manager, via letter or email at jmerrill@flyavl.com. All questions and answers regarding this process are public information and may be made available to other firms receiving this request. Questions received later than July 23rd , 2020 will not be answered. The Authority reserves the right to approve all proposed Sub-Consultants, modify roles of proposed Sub-Consultants and/or require additional Sub-Consultants in the performance of this contract. The Authority further reserves the right to award contracts to more than one consulting firm to carry out individual portions or phases of the services included in this document.

Under Construction

Transportation Terminals

$500,000.00

Public - Federal

Demolition, New Construction, Site Work

1

2

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
42
Bidding Soon
669
All Active Projects
297
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2023

img_map_placeholder

61 Terminal Dr, Fletcher, NC


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.